What is TREVIK Fire Curtain Systems?
Motorised fire-curtain pathway using zinc-coated steel profiles and fire fabric with dedicated control architecture.
Request Project PricingTREVIK · Fire Curtain Systems
TREVIK Fire Curtains brings the current zinc-coated steel-profile and fire-fabric platform into a project-led life-safety pathway for commercial, industrial and public buildings.

Quick project answers
Motorised fire-curtain pathway using zinc-coated steel profiles and fire fabric with dedicated control architecture.
Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.
Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.
Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.
Current catalogue reference

Specifier evidence checklist
Use this checklist to turn an early product choice into a project-ready brief. Only exact registered evidence should be relied on for specification, tender or order.
Confirm: Intended users / buyers: architects-specifiers. Confirm the actual application, operating intensity and project outcome.
Boundary: A product-category match is not a final suitability confirmation.
Confirm: Confirm the actual site, exposure, climate, drainage and destination conditions.
Boundary: Environmental performance claims must match the exact selected system and current evidence.
Confirm: Confirm configuration: project-reviewed, together with dimensions, quantities, interfaces and required options.
Boundary: Do not infer available sizes, spans, loads or options from representative imagery.
Confirm: Review steel · fabric against finish, corrosion, cleaning, maintenance and replacement requirements.
Boundary: Material suitability can change with exposure, assemblies and maintenance conditions.
Confirm: Request current configuration-specific technical information before specification, tender or order.
Boundary: CAD, shop drawings, structural calculations, certificates and testing are included only where they exist for the exact system and are expressly identified.
Confirm: No controlled drawing record is currently centralised for this pathway. Request the exact drawing, fixing detail, shop-drawing scope or submittal information required for the project.
Boundary: A brochure, website diagram or representative image is not a fabrication, installation or engineering drawing.
Confirm: This product has an explicit Apollo market-priority record. Confirm destination-specific standards, climate, freight, documentation and local compliance separately.
Boundary: Market priority is not evidence of code compliance, certification, structural suitability or installation approval in that destination.
Confirm: State the exact product pathway, configuration, dimensions, material / finish, required evidence, supplied scope, exclusions, delivery point and local responsibilities in the project schedule.
Boundary: Do not turn representative website wording, unverified supplier claims or another configuration's test data into a project compliance clause.
Confirm: Confirm destination, receiving point, unloading, local contractor, foundations / supports, services, installation responsibility and target programme.
Boundary: Freight, local works, engineering, commissioning and installation scope must be confirmed in the written quotation.
Apollo is supply-only unless the written project scope states otherwise. Local engineering, statutory approvals, site works and installation remain project-specific.
Project priorities
The project fire engineer must define the required compartmentation function, integrity period, trigger logic and interfaces.
Curtain size, guides, headbox, fabric and supporting construction must remain within the documented tested or certified configuration.
Alarm interface, descent logic, emergency batteries, audible/visual warning and reset behaviour must be coordinated with the building fire system.
How Apollo fits
Hero imagery is an application concept. E60 and E120 references appear in the current catalogue, but Apollo only publishes or quotes a classification where the exact opening size, installation arrangement and supporting certification cover the selected system.
Obtain the project fire strategy and required classification before product selection.
Check opening size, mounting, fabric, guides, control board and supporting construction against the current certification scope.
Coordinate alarm interface, emergency operation, inspections and destination compliance with the qualified project team.
Relevant Apollo systems
Motorised fire-curtain pathway using zinc-coated steel profiles and fire fabric with dedicated control architecture. The current catalogue shows EN 16034:2014 and E60 / E120 reference classifications, but Apollo only applies a classification where the exact opening size, mounting arrangement and certification scope cover the selected assembly.
Architects Specifiers · Hospitality · Resorts · Developers
Project Reviewed
Steel · Fabric
Coastal Review · Wind Review · Project Specific Performance Review
Pacific Islands · Australia · singapore · malaysia · Middle East
TREVIK Architectural Opening Systems · TREVIK Architectural Canopies · TREVIK Glass Sectional Opening Systems · TREVIK Transparent Commercial Closures
This snapshot summarises the current Apollo product record. Final configuration, interfaces, engineering, certification and destination requirements are confirmed against the project.
Project planning
Apollo's catalogue owner, project-brief pathway and core product record are complete enough to progress into project review and manual quotation. This is not a statement of engineering approval or destination compliance.
Apollo has an explicit regional priority map for this product. Regional mapping supports discovery and project review; it is not blanket compliance certification.
Configuration, technical evidence, interfaces, exposure or destination requirements need product-specific review before the final supply package is confirmed.
Final engineering, testing, approvals and destination requirements are confirmed for the actual project where applicable.
Connected project pathway
Architectural canopies, glazed openings, transparent closures, shutters and premium aluminium opening systems for project supply.
Open pathway Planning centreOutdoor Living & Architecture Knowledge CentreCoordinate openings, thresholds, shutters, weather exposure, supporting structure and local project responsibilities alongside the wider architectural envelope.
Open pathway SelectorTREVIK Opening SelectorNarrow the starting system by opening function, movement and project requirement.
Open pathway TechnicalTREVIK Technical CentreReview current system pathways, performance evidence controls, technical interfaces and project-specific verification requirements.
Open pathway Project briefTREVIK Project BriefSend opening dimensions, system function, glass, exposure, threshold, destination and project documentation for manual review.
Open pathwayReview this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.
No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.
Relevant project sectors
Relevant to architects and specifiers project pathways in the live catalogue.
Open sector pathway Developers & CommercialProperty development, mixed-use, repeatable amenity and multi-stage project supply.Relevant to developers and commercial project pathways in the live catalogue.
Open sector pathway Hospitality & ResortsHotels, resorts, restaurants and guest-facing destination projects.Relevant to hospitality and resorts project pathways in the live catalogue.
Open sector pathway Retail & Commercial InteriorsRetail, commercial interior, furniture, acoustic, opening and display systems.Relevant to retail and commercial interiors project pathways in the live catalogue.
Open sector pathwayBUILT INTELLIGENCE
Plan an educational observatory around learning goals, site, dome, telescope, controls, safety and local building responsibilities.
Read intelligence Architecture & specificationSpecification Before Product: How to Write a Better Project BriefA practical framework for writing a project brief that separates outcomes, verified requirements, interfaces, local responsibilities and product selection.
Read intelligence Architecture & specification2500, 3500 or 4000 Nits? Outdoor Display Brightness Without the MarketingA practical guide to outdoor display brightness covering nits, direct sun, reflections, thermal management, orientation, power, enclosure design and full-sun qualification.
Read intelligenceInstitutional & project buyers
New Zealand + international · Practical project supply
Market pathways
Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.
Dedicated New Zealand project, product, regional and decision-guide pathway.
Explore regionSports, recreation, outdoor, public-realm and development project supply.
Explore regionResort, outdoor, buildings, sports and resilience pathways with island-specific review.
Explore regionResort, architecture, sports, venue and public-realm pathways across the Gulf.
Explore regionSelected Asian project pathways for architecture, hospitality, sports and development.
Explore regionSelected European pathways across sport, hospitality, public realm and outdoor systems.
Explore regionSports, parks, venue, recreation and development supply for USA and Canada.
Explore regionBuildings, sports, education, community, hospitality and public-realm project pathways.
Explore region