01GeometryExternal envelope · internal water geometry · depth · freeboardApproved drawings control the actual pool rather than generic marketing dimensions.
02StructureSupport system · reinforcement · bearing pointsStructural construction and corrosion protection are tied to the actual pool size and production method.
03Architectural pool structureFRP shell + galvanized rectangular-steel support frameDocumented for the 10.0 × 5.0 × 1.6 m semi-inground configuration. Main frame profile is stated as 50 × 30 × 3 mm rectangular tube. Current documented shipping weight is 2,700 kg.
04Framed WPC structureWPC cladding + galvanized-steel frame + seamless FRP linerDocumented for both 3.9 m and 11.8 m framed configurations. This construction must not be generalized to unrelated ORDRAN systems.
05FRP / compositeLaminate · resin · gelcoat · barrier layersMaterial build-up, thickness and quality evidence remain tied to the production documentation.
06Framed-pool laminate8-layer schedule · approx. 8 mm nominal sumThe framed-pool schedule lists 1 mm pool-grade gel coat, CSM, two woven-roving layers, composite surface felt, hydrolysis-resistant vinyl-ester resin, further CSM and anti-aging vinyl-ester resin. Use only for the documented framed family.
07Gel coatJelmart (Jelcoat) · 1 mmNamed in the framed WPC technical sheets. Availability and exact formulation should still be reconfirmed on the production order.
08WindowsPMMA grade · thickness · support · seals · testViewing-window projects require exact material and structural evidence for the supplied panel.
09Viewing-window pathwayStandard framed + frameless systemsSupplier guidance now distinguishes a standard framed window with stated maximum size 2.86 × 0.83 m from a frameless 2.0 × 1.4 m window at fixed 22 mm thickness. Operating water depth is stated as 100 mm below shell depth. Material grade and full engineering/test evidence remain project-specific.
10HydraulicsSuction · filtration · treatment · heating · returns · overflowPipework, valves, design flow and equipment are coordinated as one hydraulic schedule.
11EquipmentPump · filter · heater/chiller · sanitation · controls · lightingBrand and model data are frozen before production rather than assumed from generic marketing information.
12Treatment optionsSalt · UV · ozone · automatic pHCurrent documented technical information supports these pathways. Exact equipment brand, model, flow, power and certifications remain project-specific.
13Smart controlMobile-app pathway availableController platform, supported functions and integration are confirmed in the final equipment schedule.
14Counter-currentSwim-jet + propeller-type pathwaysSelected system output, flow / thrust, power and controls remain configuration-specific.
15Automatic coverIntelligent villa-grade pathway availableExact cover type, motor, dimensional limits and safety evidence are confirmed for the chosen pool.
16InfinityOverflow edge · collection · balance volume · controlsInfinity / overflow projects require a genuine hydraulic design, not simply a lowered pool edge.
17Lifting + freightDry weight · transport envelope · lift points · CoGDestination handling plans use the configured pool's release documentation.
18QA48–72 h production hydrostatic holdCurrent written procedure: fill to design operating water level, hold for 48–72 h, and inspect shell, joints and viewing windows for leakage and deformation. A completed handwritten sample report has been received; the final QC / release checklist is still required.
19Water chemistrypH 7.0–7.8 · free chlorine 0.3–1.0 mg/LSupplier operating guidance also states salt-chlorinator salinity ≤5,000 ppm and maximum water temperature 38 °C. High-concentration strong acids, abrasive cleaners, undiluted corrosive agents and copper-based algaecides are prohibited.
20Corrosion controlPre-galvanized steel + zinc-rich weld repairSupplier recommends thorough weld cleanup, zinc-rich anti-corrosion primer to weld areas and effective drainage to avoid long-term saline splash or soaking of the steel frame. Exact zinc-coating thickness / mass figures remain withheld pending clarification.
21Post-install fill test24 h full-water leakage checkThe framed WPC installation sheet requires a 24-hour full-water check after foundation, positioning and pipeline connection, before commissioning.
22Framed-pool baseC25 concrete · ≥150 mm · ≤3 mm/m level toleranceThis is the documented requirement for the WPC framed pools, not a universal foundation specification for every ORDRAN project.
23Framed-pool liftingLift from steel frame onlyManufacturer instructions prohibit applying sling forces to WPC cladding, viewing glass or FRP liner.
24Warranty pathwayWritten project warranty schedule requiredShell, frame, glazing, equipment, controls and cover warranty periods are published only from the final written documents applicable to the supplied configuration.
ORDRAN is supply-only and does not include physical site inspection. Technical review is based on project information provided by the client and their local consultants / contractors. Local engineering, foundations, installation, utilities, barriers, approvals and commissioning remain project responsibilities unless expressly included.