Skip to main content
Apollo NZ GlobalStart Project Brief
ORDRANArchitectural Pool Systems

ORDRAN Technical Library · Water + Controls

ORDRAN Technical LibraryThis resource summarises current ORDRAN project-planning information. Final approved project drawings, equipment schedules and destination requirements control the supplied configuration.

Configure treatment, temperature and controls around the operating brief.

ORDRAN can be configured with salt chlorination, UV, ozone, automatic pH, heat pumps, mobile-app controls, counter-current systems and automatic covers. Exact equipment remains project-selected.

Salt · UV · ozoneAutomatic pH pathwayHeat-pump pathwayMobile-app control pathway
ORDRAN architectural pool technical informationTechnical planning information · final project documents control.

Product details

Current technical guidance

Apply these requirements only to the pool construction or project condition they relate to. Final project drawings, local engineering and component documents govern.

01Treatment
Salt chlorination · UV · ozone · automatic pHCurrent documented technical information supports these pathways; exact brand and model are project-selected.
02Temperature
Heat-pump heating / cooling pathwayCapacity depends on water volume, climate, target temperature and operating pattern.
03Smart control
Mobile-app pathwayController platform and supported functions are confirmed in the final equipment schedule.
04Counter-current
Swim-jet or propeller-type pathwayOutput, power and performance remain configuration-specific.
05Automatic cover
Intelligent cover pathwayFinal system depends on pool geometry, dimensional compatibility and component documentation.

ORDRAN is supply-only. Local engineering, foundations, lifting, installation, utilities, barriers, approvals and commissioning remain destination project responsibilities unless expressly included.

Applications + project fit

How to use this information.

Named components before release

Pump, filter, heater, sanitation and controls should be frozen by brand and model before the production package is approved.

Do not overspecify blindly

Treatment and heating should be selected around pool volume, climate, use, maintenance capability and destination power supply.

Wellness needs duty data

Hot, cold and recovery applications require realistic heating / cooling loads and operating cycles.

Controls stay serviceable

Remote functions are useful only where local users and service technicians can understand and maintain the equipment.

Applications
Project planningArchitects + specifiersLocal contractorsResort developersPool project teamsInternational supply

Connected project pathway

Everything you need to take the next project step.

ORDRAN · Architectural Pool Systems
Related pathwayProject Upload Tool
Regional project pathwayORDRAN Architectural Pool Systems for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Technical informationNeed a datasheet, drawing, test report or tender submittal?

No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.

Request technical information

Ready to review the project?

Send the dimensions, quantity, destination and the information you already have.

Apollo NZ Global

New Zealand + international project supply. Practical product pathways.
Apollo NZ Global is supply-only unless a written project scope states otherwise.

sales@apollonzglobal.com
Project