01External size11.8 × 2.2 × 1.5 mDocumented framed pool configuration.
02Internal size11.0 × 2.0 × 1.4 mCurrent ORDRAN technical sheet.
03Viewing window2.0 × 1.4 m tempered glassApplies to this documented framed configuration.
04ConstructionWPC cladding · galvanized-steel frame · seamless FRP linerThe framed construction family is separate from ORDRAN's galvanized-frame architectural CUSTOM construction.
05Self-weight3,600 kgSupplier-confirmed current figure for the 11.8 m framed pool.
06Packed size11.9 × 2.25 × 1.7 mCurrent documented packed dimensions for the LINEAR configuration.
07Transport40HQ recommendedSupplier-recommended transport pathway; container loading and route feasibility remain shipment-specific.
08BaseC25 concrete · ≥150 mm · ≤3 mm/m level toleranceCurrent documented requirement for the framed WPC system.
09LiftingSteel-frame load path · lifting lugs pre-installedSupplier states two lifting points are provided on each side, with lifting lugs pre-installed before shipment. Do not apply lifting forces to the WPC cladding, viewing glass or FRP liner.
10Post-install test24 h full-water leakage checkRequired after local positioning and service connections before commissioning.
11Treatment optionsSalt · UV · ozone · automatic pHAvailable as configured project options; exact equipment brands and models are selected before production.
12CoverAutomatic-cover pathway availableFinal cover system remains subject to dimensional compatibility and component documentation.
13Counter-currentSwim-jet pathway availableSystem size, output and electrical requirements are project-selected.
14Production QA48–72 h full-load hydrostatic testCurrent production requirement; the final project release pack should retain the completed test evidence.
15ControlsMobile-app smart-control pathway availableThe exact controller, functions, compatibility and electrical requirements are confirmed in the project equipment schedule.
ORDRAN is supply-only and does not include physical site inspection. Project development uses dimensions, drawings, photos, access information, intended use and other information supplied by the client and local project team. Foundations, lifting, installation, electrical, plumbing, barriers, approvals and commissioning remain local project responsibilities unless expressly stated otherwise.