Product details
What is defined before a cold plunge system is selected
Cold plunge performance depends on the complete water and equipment system. The vessel, chiller, filtration and controls are matched to the project as one coordinated configuration.
01Vessel formatProject selectedFreestanding, integrated or built-in pathways are reviewed against the site, access, finish direction and intended operating model.
02Cooling systemDedicated chiller pathwayCooling capacity, ambient conditions, target operating range and equipment location are confirmed for the selected system.
03Water circulationProject-specificPump, filtration and treatment requirements depend on vessel volume, bather load, operating pattern and local requirements.
04Equipment locationIntegrated or remote pathwayVentilation, service clearance, noise, weather exposure and access are considered before the equipment position is fixed.
05UtilitiesPower · water · drainageElectrical supply, filling, discharge and maintenance access are coordinated with the destination project team.
06Insulation + coverConfiguration dependentInsulation and cover strategy are reviewed as part of temperature stability, energy use and outdoor exposure.
07Finish + materialsSelected per systemVessel construction, internal finish, exterior cladding and hardware are matched to the selected configuration.
08QuotationManual project quotationFinal supply scope is quoted after the project and destination are reviewed.
Apollo is supply-only. Final electrical work, water connection, drainage, foundations or support, installation, commissioning, local approvals and operating procedures remain project-specific and must be completed by appropriately qualified parties.