ATHREN Timber · Specifier Checklist

Resolve the hall interfaces before the sprung floor is frozen.

A practical coordination checklist for designers, venue teams and project managers specifying ATHREN timber sports flooring.

07specifier coordination groups
Supply-only project pathwayCurrent construction documents reviewedFIBA test evidence kept configuration-specific2020 laboratory results separated from current approval status

Pre-specification checklist

Coordinate more than the timber.

The floor is connected to the slab, equipment, thresholds, services, line plan and hall operating model. The checklist keeps those interfaces visible before quotation and installation planning.

01

SPORT + COMPETITION

  • Primary and secondary sports
  • Competition / governing-body requirement
  • Court dimensions and run-off
  • Permanent court markings and graphics
  • Portable or fixed basketball equipment interfaces
02

SLAB + LEVEL

  • Finished concrete datum
  • 2 m straightedge / flatness survey
  • Cracks, joints and local level changes
  • Available total floor build-up
  • Threshold and adjacent-finish levels
03

MOISTURE + ENVIRONMENT

  • Current slab moisture information
  • Building enclosed / conditioned status
  • Expected operating temperature and humidity
  • Perimeter wall conditions
  • Any underfloor heating or unusual environmental exposure
04

SERVICES + EQUIPMENT

  • Basketball backstop bases and floor interfaces
  • Volleyball / badminton / other floor sockets
  • Electrical and data penetrations
  • Underfloor ducts or services
  • Divider-curtain and equipment parking zones
05

FLOOR DETAIL

  • Single- or double-batten pathway
  • Final board specification and finish
  • Perimeter expansion strategy
  • Intermediate movement provisions
  • Ventilation locations
  • Line-marking and logo requirements
06

EVENT + OPERATIONS

  • Temporary seating or staging
  • Trolley / equipment movement
  • Floor protection for non-sport use
  • Cleaning and maintenance model
  • Storage for protection materials
07

EVIDENCE + HANDOVER

  • Current FIBA approval / official listing where required
  • 2020 laboratory report retained as historical performance evidence
  • Current production equivalence to the tested configuration
  • Fire / VOC / EN 14904 documentation where required
  • Installation instructions and tolerances
  • Warranty and maintenance guide
  • Final as-supplied configuration record

Current hold points

Do not close these from assumptions.

These items remain explicit hold points until current manufacturer or project evidence is available.

Hold point

01

Current production equivalence to the 2020 tested single- and double-keel samples

Hold point

02

Exact finished board thickness and the 20 mm / 22 mm notation

Hold point

03

Double-keel current 19 mm subfloor source versus 18 mm in the 2020 test report

Hold point

04

Current FIBA approval/listing, EN 14904, fire/VOC, warranty and maintenance evidence

Turn the checklist into project data

Complete the flooring brief next.

The project brief records the key selection inputs in one shareable summary for Apollo's technical and commercial review.

Open Project Brief View Technical Diagrams

Direct project answers

What project teams need to know about this ATHREN timber-flooring pathway.

Evidence-controlled answers for system selection, specification and project review.
01

What is ATHREN Timber Flooring Specifier Checklist?

Pre-specification coordination checklist covering sport and competition requirements, slab and levels, moisture/environment, services and equipment…

02

What projects are suitable for athren timber flooring specifier checklist?

Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.

03

What information is needed to specify athren timber flooring specifier checklist?

Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.

04

Can Apollo NZ Global supply athren timber flooring specifier checklist internationally?

Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.

ATHREN
Timber Sports Flooring

Sports & Flooring Systems · By Apollo NZ Global

Contact Apollo
Project