55%
Force reduction
Start Flooring Brief
ATHREN COURT · ATHREN T-D2
Fixed area-elastic timber sports-floor pathway using upper and lower timber support layers separated by resilient cushioning, with a lower levelling / shock-support layer.
Documented build-up
2020 laboratory reference
Laboratory report performance reference only. The tested sample records an 18 mm subfloor. The report is not a Certificate of Approval and does not establish current production equivalence.
Force reduction
Vertical deformation
Ball rebound
Slip resistance
Resistance-to-wear mass loss
Rolling-load indentation
Two manufacturer timber-floor samples were tested under the FIBA Equipment & Venue Centre Approval Programme in 2020 and recorded as PASS against the submitted Level 2 wooden-floor requirements. The reports are laboratory test reports, not Certificates of Approval.
ATHREN · technical diagrams
These original diagrams translate the current installation documents into a clean ATHREN planning language. They show documented layer order and nominal build heights, while disputed spacing and model-specific performance remain deliberately unlabelled.
Birch playing surface over moisture control, solid-pine subfloor, timber battens and resilient rubber support.
Two timber batten layers separated by intermediate resilient pads, over a lower resilient levelling layer.
Current instructions document a ≤5 mm / 2 m base check, perimeter expansion, intermediate movement provisions and finished-floor ventilation.
Project-specific selection
Confirm slab flatness, moisture, finished floor level, underfloor services, equipment sockets, line marking, event use and local installation responsibilities.
Direct project answers
Approx. 158 mm adjustable double-keel / double-batten timber sports-floor pathway with upper/lower 45 × 45 mm supports and 8 mm intermediate resilient…
Typical project pathways include residential projects, commercial projects, hospitality projects, and international projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.
Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.
Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.