Apollo's catalogue owner, project-brief pathway and core product record are complete enough to progress into project review and manual quotation. This is not a statement of engineering approval or destination compliance.
Flood Protection · rapid-deployment modular barriers
Interlocking plastic flood barriers for rapid temporary water diversion and perimeter defence.
A portable L-shaped modular barrier family for temporary flood control around roads, entrances, underground access, public spaces and industrial sites. Straight, inward-turning, outward-turning and edge modules allow the line to follow the site rather than only forming a straight wall.

Where it fits
Applications
Product selection follows the opening, flood path, deployment time and local project conditions.
System operation
How the product works
- 01
Individual L-shaped modules are positioned along the required flood-control line.
- 02
Modules connect into straight runs or use inward/outward components to change direction.
- 03
The broad horizontal foot faces the water side so water loading contributes to barrier stability.
- 04
Edge or retractable components can close selected ends and transitions depending on the chosen family.
- 05
After the event, modules can be separated, cleaned, stacked and stored for future deployment.
Supplier reference data
Current reference specifications
These figures come from the supplied manufacturer documentation and public product material. Apollo confirms the exact current configuration before quotation or specification.
Real product reference imagery
Actual manufacturing-network products and deployments.


Technical control
Keep performance claims tied to the exact system.
Final model selection needs to match the required barrier height, ground condition, flow direction, line geometry and deployment plan. Supplier dimensions are useful reference data, but Apollo will confirm the exact current model and technical documentation before quotation.
Apollo NZ Global · Flood Protection
Send the opening, site photos and the flood-risk information.
For fixed barriers, include clear width, target protection height, wall/floor construction and any available flood-level information. For temporary systems, include the line length, site geometry, storage and deployment requirements.
Product status
What Apollo has confirmed at catalogue level.
Apollo has an explicit regional priority map for this product. Regional mapping supports discovery and project review; it is not blanket compliance certification.
Configuration, technical evidence, interfaces, exposure or destination requirements need product-specific review before the final supply package is confirmed.
Status signals describe Apollo's current product record and project pathway. They do not replace project-specific engineering, testing, local approvals or destination compliance review.
Connected project pathway
One owner for each decision. One route into the project.
Whole-property resilience pathways covering wind, flood, water, heat, wildfire, coastal exposure and continuity planning.
Open pathway Knowledge ownerClimate & Global ProjectsCoastal, UV, rain, high-wind, cyclone/hurricane exposure and remote-project planning.
Open pathway ExposureClimate Exposure SelectorScreen salt, UV, rain, wind and remote-logistics conditions before product selection.
Open pathway TechnicalTechnical & Specifier CentreUse current product evidence, controlled technical information and professional project resources.
Open pathway Project briefGlobal Project BuilderCompile destination, exposure, scope, evidence and logistics for manual Apollo review.
Open pathwayComplete the project
Consider the systems that naturally sit around this decision.
Map vulnerable openings and compare coordinated severe-weather protection pathways.
Add reusable opening protection where floodwater is part of the site risk.
Another flood protection pathway worth comparing for the same project territory.
Related discovery is a catalogue recommendation, not a statement of technical compatibility. Final interfaces and project requirements are reviewed separately.
