Skip to main content
Apollo NZ GlobalStart Project Brief
ORDRANArchitectural Pool Systems

ORDRAN WELLNESS · Wellness + recovery pools

ORDRAN project-configured pathwayThis pathway is configured around the project brief and ORDRAN production capability. Final geometry, structure, equipment and performance information follow the approved project documents.

Hot, cool, spa and recovery water systems developed around the operating brief.

ORDRAN WELLNESS covers selected plunge, spa, hot/cold, hydrotherapy and recovery pathways. Temperature, sanitation, circulation, insulation, controls and operating duty are specified as part of the project rather than assumed from lifestyle imagery.

Hot + cold pathwaysSpa + hydrotherapy conceptsResidential · hospitality · recoveryEquipment performance project-confirmed
ORDRAN wellness water and control systemsRepresentative architectural direction · final manufactured configuration follows the approved ORDRAN project documents.

Starting configurations

Start with the type of pool — then configure the project.

These are ORDRAN project archetypes, not fixed catalogue model numbers. Dimensions, structure, equipment and finishes are developed around the approved project brief.

01 · Heated wellness pool

ORDRAN HOT

A temperature-controlled relaxation or hydrotherapy pathway using project-selected heat-pump and treatment equipment.

02 · Cooling / recovery pool

ORDRAN COLD

A recovery-oriented pool pathway where cooling, circulation, sanitation and operating duty are specified together.

03 · Hot + cold / pool + spa

ORDRAN DUAL

A dual-zone concept requiring coordinated temperature, hydraulic and control systems.

04 · Counter-current training

ORDRAN CURRENT

A compact exercise and recovery pathway using either swim-jet or propeller-type counter-current technology.

Product details

ORDRAN WELLNESS project framework

These are the fields the final project will control. Numerical values and performance claims remain tied to the selected production system and documented project information.

01Temperature
Project-definedHeating and cooling equipment is selected against water volume, target temperatures, climate and operating duty.
02Treatment
Project sanitation packageSalt, UV, ozone, dosing and automation remain optional pathways requiring current equipment data.
03Hydrotherapy
Jets / spa / recovery by configurationPump duty, jet layout and controls must be matched to the selected wellness use.
04Dual-zone
Hot / cool or pool / spa pathwaySeparate temperatures and circulation zones require coordinated shell, divider, hydraulics and controls.
05Water treatment
Salt · UV · ozone · automatic pHAvailable equipment pathways; named components and performance data are confirmed for the project.
06Heating / cooling
High-efficiency heat-pump pathwayExact heating or cooling duty remains dependent on volume, climate, target temperature and operating pattern.
07Counter-current
Swim-jet or propeller-type systemPump / thruster model, output, power and performance are confirmed in the equipment schedule.
08Production QA
48–72 h full-load hydrostatic testCurrent production requirement; the final project release pack should retain the completed test evidence.
09Controls
Mobile-app smart-control pathway availableThe exact controller, functions, compatibility and electrical requirements are confirmed in the project equipment schedule.

ORDRAN is supply-only and does not include physical site inspection. Project development uses dimensions, drawings, photos, access information, intended use and other information supplied by the client and local project team. Foundations, lifting, installation, electrical, plumbing, barriers, approvals and commissioning remain local project responsibilities unless expressly stated otherwise.

ORDRAN PROJECT QUESTIONS

What to know before configuring ORDRAN WELLNESS.

01

Is ORDRAN a standard-size pool range?

No. ORDRAN is the made-to-measure architectural pool pathway. Final length, width, depth and internal geometry remain bounded by the selected construction system, structural requirements, manufacturing limits, freight and the approved project documents.

02

Does ORDRAN include installation?

ORDRAN is supply-only. Foundations, lifting, placement, local installation, electrical, plumbing, barriers, approvals and commissioning remain with the client and local project team unless the written quotation expressly includes something different.

03

Does ORDRAN carry out physical site inspections?

No. Project review is remote and uses dimensions, drawings, photographs, levels, access and crane information, destination details and other project information supplied by the client and local project team.

04

How is an ORDRAN pool project started?

Start with the architectural pool brief: intended use, desired geometry, edge condition, viewing-window intent, water systems, access, destination and project stage. The closest ORDRAN production pathway is then configured around that brief.

Applications + project fit

Designed around the project brief.

Performance before lifestyle language

The project starts with temperature, users, operating hours and recovery / relaxation goals before equipment is selected.

Compact to resort scale

The family can support private wellness rooms, sports recovery, spas and selected resort wellness projects.

Serviceable equipment

Frequent-use wellness systems need realistic filter, heater/chiller, control and sanitation access.

Evidence-controlled

Temperature ranges, heating/cooling rates and sanitation performance are published only from current component data.

Applications
Private wellnessResort spasSports recoveryHotelsRetreatsPremium homesTraining facilities

Connected project pathway

Everything you need to take the next project step.

ORDRAN · Architectural Pool Systems
Related pathwayProject Upload Tool
Regional project pathwayORDRAN Architectural Pool Systems for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Technical informationNeed a datasheet, drawing, test report or tender submittal?

No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.

Request technical information

Related project systems

Build the wider project around the primary product.

Related products are suggestions for project coordination, not automatic inclusions.

Ready to review the project?

Send the dimensions, quantity, destination and the information you already have.

Apollo NZ Global

New Zealand + international project supply. Practical product pathways.
Apollo NZ Global is supply-only unless a written project scope states otherwise.

sales@apollonzglobal.com
Project