What the layer can do
Depending on the exact construction, a shock or elastic layer may contribute to impact management, field response, consistency and system durability.
New build
On a new field, the elastic layer can be coordinated with the planned base, drainage and selected turf from the beginning.
- Confirm compatibility with the turf system
- Coordinate drainage and permeability
- Protect dimensional and level tolerances during construction
Existing-field replacement
An existing shock pad should never be assumed suitable for reuse because it is physically present.
- Review age and condition
- Check flatness, joints and local damage
- Confirm whether the proposed replacement system permits reuse
- Testing may be required where formal performance criteria apply
Interface control
The shock layer sits between the surface and the supporting construction, so defects below it can still affect the finished field.
