Skip to main content
Apollo NZ GlobalStart Project Brief
← Technical Centre

Water management

Sports Turf Drainage

Good artificial turf cannot compensate for a field that does not manage water correctly. Surface, base and site drainage need to be considered together.

LUTHVAR Technical Guidance

Drainage review should start with the site and supporting construction, not with a headline permeability figure for the turf alone.

Surface drainage

Water must be able to move through or across the playing surface as intended by the selected construction. Seams, infill, contamination and maintenance can all influence real-world drainage behaviour.

Base drainage

The prepared base and drainage network need to receive and discharge water without creating soft spots, ponding or trapped moisture.

  • Review finished falls and tolerances
  • Understand sub-base permeability
  • Coordinate collector drains and discharge points
  • Allow for local rainfall intensity and site constraints

Replacement fields

Replacing turf does not repair an underlying drainage problem. Existing-field projects should review historic ponding, blocked drains, settlement and base movement before the new surface is installed.

Tropical and high-rainfall sites

Heavy rainfall and high humidity increase the importance of drainage capacity, maintenance access and contamination control.

Evidence stays tied to the exact construction.

Technical guidance explains the decision framework. Final dimensions, materials, test values, warranties, performance classifications and certification statements are confirmed only for the exact project system supported by current documentation.

Continue technical planning

Infill, Reduced-Infill & Non-InfillShock Pads & Elastic LayersNew Field vs Resurfacing
Project