Infill strategy affects the way an artificial sports field is designed, maintained and reviewed. Conventional, reduced-infill and non-infill systems should not be treated as interchangeable versions of the same product.

LUTHVAR Technical Guidance

Start with the sport, playing level, expected use, maintenance capability and any evidence requirement. Then confirm the exact turf construction and infill direction.

Conventional infill

Many sports-turf systems use stabilising and/or performance infill as part of the tested field construction. Infill quantity, material, depth and maintenance remain system-specific.

  • Can contribute to fibre support and surface stability
  • May form part of the tested performance construction
  • Requires an operating plan for distribution, decompaction, contamination control and top-up

Reduced-infill

Reduced-infill systems aim to use less infill while retaining the required field behaviour. They are not simply conventional systems with material removed.

  • Turf construction may change to support lower infill quantities
  • Maintenance requirements can differ
  • Performance claims must relate to the exact reduced-infill construction

Non-infill

Non-infill systems remove conventional performance infill from the playing surface, but they still require complete-system review.

  • Fibre and backing construction become especially important
  • Shock layer and base interfaces may carry more of the system response
  • Cleaning and fibre management still matter

What not to assume

A field should not be converted from one infill strategy to another by changing only one layer unless the complete construction has been reviewed for that use.

Evidence stays tied to the exact construction.