Skip to main content
Apollo NZ GlobalStart Project Brief

TIRREN · Resort, Leisure & Waterfront Systems

TIRREN waterfront systems for resorts, marinas and leisure destinations.

TIRREN brings modular floating docks and walkways, PWC and drive-on boat docks, marina platforms, swim and event platforms, floating-leisure-pool pathways, aluminium-frame docks and custom floating configurations into one project-led resort and marine pathway.

Resort · marina · residential waterfrontHDPE modular + aluminium-frame systemsSupply-only marine pathway

Project pathways

Need a wider resort package?

This zone can be combined with other resort-development pathways without forcing every product into the public catalogue.

Project priorities

Marine products require site information before a manufacturer can confirm the correct system.

01

Water conditions

Wave, current, tide, water depth and storm exposure affect the system, anchoring and allowable use.

02

Loads + access

Guest numbers, watercraft, gangways, accessibility and operational use determine deck and connection requirements.

03

Material durability

UV, saltwater, hardware and flotation materials need documented performance and commercial warranty terms.

04

Engineering ownership

The marine-system manufacturer or specialist engineer must retain design and installation responsibility for engineered waterfront work.

How Apollo fits

Apollo starts with the RFP, then qualifies the right supply pathway.

TIRREN is supplied on a project basis. Apollo does not offer full marina engineering or marina construction. Craft limits, buoyancy, anchoring, wave/current conditions, engineered marine design, approvals and installation remain configuration- and project-specific.

01

Send the brief

Tell Apollo what the development needs, the destination, quantity, timing, drawings and the performance issues that matter.

02

Match the supply route

Existing Apollo systems are combined with qualified project-sourced products where the brief reaches beyond the published catalogue.

03

Verify the manufacturer

Apollo checks the relevant factory, project evidence, technical documents, warranty, export capability and specialist responsibilities before quotation.

04

Confirm the package

The final offer identifies the products, documentation, freight pathway and the manufacturer or local specialist responsibilities that sit outside Apollo's supply scope.

Relevant Apollo systems

Products can be selected individually or combined around the project.

TIRREN Modular Floating Dock Systems TIRREN Floating Walkways & Landscape AccessTIRREN PWC / Jet Ski Docks TIRREN Drive-On Boat Docks TIRREN Marina & Boat PlatformsTIRREN Swim, Leisure & Event PlatformsTIRREN Floating Leisure Pool PlatformsTIRREN Aluminium-Frame Floating DocksTIRREN Curved & Custom Floating PlatformsKayak / SUP storage & launching systemsAccessible marine ladders, ramps & access systemsAnchoring & mooring systemsCivaro Coastal

Connected project pathway

Everything you need to take the next project step.

Resorts & Destination Developments
Regional project pathwayResort & Destination Development Sourcing for Pacific Island projects

Review this system against the actual island, coastal exposure, wind or cyclone criteria, freight route and local project responsibilities before the final configuration is selected.

Technical informationNeed a datasheet, drawing, test report or tender submittal?

No current public document is registered against this exact page yet. Tell Apollo what the project needs and the team can review the current product/configuration-specific information available.

Request technical information

Institutional & project buyers

Follow the pathway that matches the organisation buying the product.

New Zealand + international · Practical project supply

Send the brief before you have every detail resolved.

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Project