Skip to main content
Apollo NZ GlobalStart Project Brief

TIRREN · Washbasin Range

A controlled solid-surface basin range for repeated hospitality bathrooms.

The TIRREN washbasin programme combines selected standard basin formats with project-specific vanity fabrication. Public TIRREN model codes keep the range simple for schedules and specifications while backend manufacturing references remain controlled inside the project file.

10 selected basin formatsMatte + selected glossy-white finishesModel-specific compliance documentation available where verified

Selected range

Selected TIRREN basin formats.

Dimensions below are taken from the current manufacturer product schedule. Final tap-hole configuration, waste, overflow, mounting method, fixing and compliance documentation are checked before the product is released into a project schedule.
ModelFormNominal dimensionsFinishProject note
TIRREN B1195Linear vanity basin1195 × 455 × 20 mmMatte WhiteLong-format vanity application.
TIRREN B400Compact square basin400 × 400 × 130 mmMatte WhiteCompact hospitality bathroom format.
TIRREN B1200Linear vanity basin1200 × 500 × 100 mmMatte WhiteLong single-room vanity pathway.
TIRREN P445Freestanding pedestal basin445 × 445 × 900 mmGlossy WhiteFloor-standing statement basin.
TIRREN B900Compact vanity basin900 × 480 × 145 mmMatte or Glossy WhiteProject tap and waste configuration to be confirmed.
TIRREN B1500Long vanity basin1500 × 500 × 120 mmMatte or Glossy WhiteSuitable for larger vanity runs and repeated room types.
TIRREN B1845-2HLinear basin · two tap holes1845 × 480 × 100 mmMatte or Glossy WhiteTwo factory tap-hole configuration.
TIRREN B1845-1HLinear basin · one tap hole1845 × 480 × 100 mmMatte or Glossy WhiteOne factory tap-hole configuration.
TIRREN B1500-SSlimline vanity basin1500 × 455 × 20 mmMatte or Glossy WhiteSlim-edge long vanity format.
TIRREN I540Insert / integrated basinExternal 540 × 370 × 130 mm · bowl 475 × 305 × 70 mmMatte or Glossy WhiteFinal installation method is matched to the selected vanity build-up.

TIRREN codes are project-facing identifiers. Product-specific third-party documentation is matched to the nominated backend model before any certification statement is included in a project submittal.

Project pathways

Continue the bathroom specification.

Project priorities

Select by room type first, then lock the basin detail.

01

Room geometry

Vanity length, circulation, mirror position, tap location and service access determine which basin family is practical.

02

Mounting pathway

Current installation documentation covers wall-hung, countertop, semi-inset, pedestal and cabinet-mounted approaches, but not every model uses every method.

03

Tap + waste

Tap-hole count, overflow, waste, trap and service access are confirmed against the actual product and plumbing design.

04

Compliance

Selected basin models have model-specific plumbing documentation available. Current listing status and exact model coverage are checked before issue.

How Apollo fits

Turn the basin schedule into a controlled project package.

Apollo/TIRREN is supply-only. Final plumbing design, wall or cabinet support, installation, waterproofing, accessibility compliance and local approvals remain project-specific.

01

Choose room type

Separate standard rooms, suites, accessible rooms, villas and public washrooms before product selection.

02

Nominate basin format

Select the TIRREN basin code, finish and preliminary mounting pathway.

03

Confirm technical interfaces

Resolve dimensions, tap holes, waste, wall or cabinet support and any accessibility requirements.

04

Issue submittal

Release drawings, selected model data and applicable product documentation for approval before production.

Relevant Apollo systems

Products can be selected individually or combined around the project.

TIRREN Bathroom & Vanity Systems TIRREN Technical Library

Regional project authority

See how this product is planned for priority markets and countries.

These pages connect commercial search intent to destination-specific climate, site, freight, procurement and project-brief guidance without changing the wider global availability of the product.

Institutional & project buyers

Follow the pathway that matches the organisation buying the product.

New Zealand + international · Practical project supply

Send the brief before you have every detail resolved.

Market pathways

Move between regions without losing the project context.

Choose the regional hub first, then the country where a dedicated pathway exists. Product suitability, documentation, freight and local project responsibilities are still confirmed against the actual site.

Project