PROJECT DECISIONS
Resolve the interfaces that control the system.
The product comes after the operating brief. Building structure, surface, movement routes, services and maintenance access can all change the correct system.
01Court zoning
Define how many courts operate concurrently, where the divider line sits, and whether player, coach or spectator circulation crosses the divider zone.
02Clear height
Check the divider, support rail, motor, folded/wound storage envelope and adjacent sports equipment against the hall's usable clear height.
03Building structure
Resolve suspension points, roof loads, secondary steel, fixing method and deflection limits with the building engineer before manufacture.
04Material strategy
Choose solid, mesh or combination construction around visibility, airflow, ball control, cleaning, durability and fire requirements.
05Controls & safety
Set local controls, key access, limit switches, obstacle / movement safety, emergency stop and manual recovery requirements for motorised systems.
06Multi-sport conflicts
Coordinate lighting, scoreboards, basketball backstops, volleyball posts, badminton layouts, HVAC and acoustic systems around the divider path.