Skip to main content
Apollo NZ GlobalStart Project Brief
SARENTAARCHITECTURAL STRUCTURE SYSTEMS

Performance · touring · stage

Temporary performance venues where structure and production systems are planned together.

The documented project portfolio includes stage-led event halls and touring-performance examples. Apollo can coordinate the SARENTA shell with HLJÓÐ sound, LED, lighting, stage and rigging pathways.

NZ + international supply-only Project-specific engineering CAD + technical documents available
Large clear-span event structure suitable for performance and touring productions

Documented capability

Current positioning tied to documented capability.

The company profile shows event-opening ceremonies, outdoor studio installations and a 2025 touring-performance venue inside clear-span event structures.

Touring showsPerformance venuesTemporary theatresConcert hospitalityBroadcast studiosCeremonies

Project priorities

Resolve the operating brief before the structure is frozen.

01

Production loads

Truss, lighting, LED, audio and scenic loads must be declared for engineering rather than assumed from the event-shell geometry.

02

Audience + sightlines

Seating, stage height, FOH positions, circulation and emergency egress determine the usable audience envelope.

03

Acoustic environment

Membrane and hard surfaces can create challenging reverberation; acoustic treatment is a separate performance requirement.

04

Power + operations

Distribution, backup power, cable routes, HVAC, loading access and production compounds belong in the venue plan.

Supply package pathway

Build the structure and supporting package around one controlled brief.

Exact inclusions remain quotation-specific. The items below are capability pathways, not an assumption that every component is included in every structure.

Stage flooring

Lighting truss

Sound coordination

LED display coordination

Audience flooring

Doors + egress

Air-conditioning pathway

Shared SARENTA platform

5–60 m main-series clear spans with project-specific heights and engineering.

SARENTA uses documented 6061-T6 extruded aluminium framing and PVC membrane options from 650–1250 gsm with optional PVDF top coat. Wall, insulation, anchoring, wind, snow, fire and permanent-use requirements are confirmed for the live project.

Open SARENTA Technical Centre

Plan · specify · compare

Supporting pathways for SARENTA EVENT · Performance & Touring Venues.

Use the parent category, technical guidance and project tools to confirm application, evidence and supply requirements without creating duplicate search pages.
SARENTA

Project review

Send the destination, use, approximate dimensions and known design criteria.

Apollo NZ Global is supply-only. Foundations, local engineering, erection, services, fire strategy, accessibility, permits and statutory compliance remain with the appropriate project parties unless expressly included in the quotation.

Start project
Project