Skip to main content
Apollo NZ GlobalStart Water Project Brief
RHELGAN Water Systems

RHELGAN · WATER POINTS

Community Water Points & Tap Stands

Controlled public water-distribution points for communities, schools, camps and recovery sites where safe access, drainage, queueing, fixtures and maintainability matter as much as the upstream tank.

01CLEAN WATER
02MANIFOLD
03ISOLATION
04TAP STAND
05DRAINAGE
06USER

Direct project answers

What project teams need to know about Community Water Points & Tap Stands.

A concise planning and evidence layer for early specification and project review.
01

What is RHELGAN Community Water Points & Tap Stands?

Controlled public water-distribution points for communities, schools, camps and recovery sites where safe access, drainage, queueing, fixtures and…

02

What projects are suitable for community water points and tap stands?

Typical project pathways include development infrastructure, remote communities, schools and health facilities, and international community water projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.

03

What information is needed to specify community water points and tap stands?

Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.

04

Can Apollo NZ Global supply community water points and tap stands internationally?

Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.

Where it fits

Applications that benefit from this pathway.

Village water pointsEmergency campsSchoolsCommunity facilitiesTemporary recovery sitesDistributed public collection points

Selection factors

Define these before equipment is fixed.

01

Peak users

02

Number of outlets

03

Available pressure

04

Drainage

05

Accessible use

06

Queueing and circulation

07

Fixture durability

08

Cleaning and maintenance

Specification controls

Keep the public pathway useful without turning planning data into guarantees.

Tap count follows expected peak use and pressure rather than population alone.

Standing water and poor drainage can undermine an otherwise safe water point.

Public access, accessibility and child use should be considered in layout and fixture height.

Local civil works and drainage are coordinated with the water-point equipment.

Working resources

Carry this section through design, procurement and handover.

Project note

A public water point is a small but high-use piece of infrastructure. Pressure, drainage, access, cleaning and replacement parts should be planned from the start.

Final equipment, material, capacity, certification, drawings, performance and commercial scope are confirmed against the exact project configuration.

RHELGAN · WATER STORAGE & SUPPLY SYSTEMS

Use the project brief to turn the requirement into a technical handoff.

Start Water Project Brief Upload project documents
Project