Skip to main content
Apollo NZ GlobalStart Water Project Brief
RHELGAN Water Systems

RHELGAN · EMERGENCY WATER

Emergency Water Systems

Rapid-deployment storage, treatment, pumping and distribution packages for disaster response, temporary settlements, field operations and the transition into recovery infrastructure.

01SOURCE
02RAPID TREATMENT
03FLEXIBLE STORAGE
04TRANSFER
05TAP POINTS
06OPERATIONS

Direct project answers

What project teams need to know about Emergency Water Systems.

A concise planning and evidence layer for early specification and project review.
01

What is RHELGAN Emergency Water Systems?

Rapid-deployment storage, treatment, pumping and distribution packages for disaster response, temporary settlements, field operations and the transition…

02

What projects are suitable for emergency water storage and supply systems?

Typical project pathways include disaster response, temporary camps, recovery programmes, and field infrastructure. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.

03

What information is needed to specify emergency water storage and supply systems?

Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.

04

Can Apollo NZ Global supply emergency water storage and supply systems internationally?

Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.

Where it fits

Applications that benefit from this pathway.

Disaster responseTemporary campsField medical and coordination sitesRecovery settlementsTemporary school / community facilitiesService restoration while permanent systems are rebuilt

Selection factors

Define these before equipment is fixed.

01

People served and response phase

02

Source-water condition

03

Refill interval and tanker logistics

04

Deployment duration

05

Ground condition and drainage

06

Transport and handling constraints

07

Available power

08

Operator skill and consumable supply

Specification controls

Keep the public pathway useful without turning planning data into guarantees.

Flexible storage is selected as part of an operating kit, not as a tank alone.

Raw and treated water should be clearly separated where both exist on site.

Hoses, valves, repair kits, ground protection and distribution fittings are part of the deployment plan.

Cleaning, disinfection and repair records matter between deployments.

Working resources

Carry this section through design, procurement and handover.

Project note

Emergency planning populations are not performance guarantees. Required quantity, storage turnover and treatment depend on programme standards, climate, response phase, source quality and refill logistics.

Final equipment, material, capacity, certification, drawings, performance and commercial scope are confirmed against the exact project configuration.

RHELGAN · WATER STORAGE & SUPPLY SYSTEMS

Use the project brief to turn the requirement into a technical handoff.

Start Water Project Brief Upload project documents
Project