Skip to main content
Apollo NZ GlobalStart Project Brief
Auremont Container Pools

Auremont Options + Configuration

Build one coordinated pool configuration — not a pile of add-ons.

Use the Auremont option families to decide which architectural, internal-layout, performance, water-system and cover features matter to the project before the final CAD and equipment schedule are released. Exact compatibility remains project-confirmed against the selected standard pool size.

Configuration principleChoose the pool first. Coordinate options around it second.
Early decisionsShell-changing options belong in CAD before production.
Water systemsFiltration, heating, treatment and performance need one equipment schedule.
CompatibilityFinal project documents control what is supplied.

Curated option families

Six decisions that materially change the finished Auremont pool.

These are the options worth treating as part of the pool design rather than late-stage accessories. Each can influence layout, services, structure or maintenance.

Auremont modular pool concept with clear viewing-window panels
01Architectural feature

Acrylic Viewing Window

Create a transparent architectural edge where the pool is intentionally visible above grade or integrated into a designed landscape.

What it changesShell opening + reinforcementPanel size / positionSeal + retaining interfaceSurrounding finish + access
Select before final project CAD.
White Auremont modular container pool with visible shell and architectural deck integration
02Exterior integration

WPC + Architectural Exterior

Coordinate the visible pool exterior with decking, landscape architecture and access panels rather than treating the container form as an unfinished object.

What it changesExterior finish strategyDeck interfacesEquipment access panelsDrainage + maintenance
Resolve with finished levels and landscape design.
Auremont modular container pool with shallow Baja shelf and in-pool loungers
03Internal layout

Baja Shelf + Shallow Ledge

Add a shallow entry, lounging or relaxation zone within the selected standard pool footprint where the final internal layout allows.

What it changesInternal swim areaSteps + circulationWater depth transitionsFurniture / lounger clearances
Select before internal shell layout is frozen.
Conceptual Auremont dual-zone pool and spa cross-section
04Dual-zone option

Pool + Spa / Dual Zone

Create two operating zones within one modular pool project when separate relaxation, spa or contrasting-temperature use is required.

What it changesInternal divider + layoutSeparate circulation logicHeating / temperature controlControls + equipment package
High-integration option — select early.
Counter-current swim equipment for an Auremont modular pool
05Performance option

Counter-Current Swim System

Add a continuous-swimming pathway where exercise or training is important but the project does not need a conventionally long lap pool.

What it changesHydraulic demandElectrical demandEquipment-bay configurationSwim-zone layout
Confirm before the equipment schedule is released.
Optional pool water treatment equipment for Auremont
06Water system

Filtration, Treatment + Automation

Structure the equipment layout, filtration, heating and selected treatment upgrades as one coordinated water system rather than adding unrelated equipment after manufacture.

What it changesIntegrated / concealed plant layoutPump / filter coordinationTreatment equipmentElectrical + controls
Choose the desired operating pathway before final equipment selection.

Water-system pathways

Choose the plant layout and operating outcome before individual equipment.

Auremont can be reviewed around compact integrated filtration or a more concealed plant arrangement, then matched with heating, treatment and controls. The final equipment schedule is tied to the selected pool, site, options and destination rather than a generic website equipment list.

Integrated filtration

Compact integrated pump-and-filter equipment can be coordinated with the modular pool where the selected size, access and maintenance strategy suit an onboard service arrangement.

Concealed / buried plant

A concealed or buried equipment arrangement can be reviewed where the project wants the pool edge kept visually cleaner. Access, ventilation, drainage and future servicing still need to remain practical.

Salt + UV treatment

Salt-chlorination and UV pathways can be reviewed as part of the final water-quality package, with exact component models and compatibility confirmed before production.

Controls + automation

Compatible controls can coordinate selected circulation, heating, lighting, treatment or backwash functions. The exact control platform and connected functions are confirmed on the final equipment schedule.

Auremont ultraviolet treatment equipment
UV treatment pathway
Auremont automatic backwash equipment
Automatic backwash pathway
Pool filtration and cleaning control panel
Control + filtration pathway

Experience + ownership systems

Lighting, water movement, swim performance and day-to-day care.

These options do not change the Auremont size architecture, but they materially affect the equipment schedule, electrical load, hydraulics, commissioning or handover package.

Pool lighting

Plan standard white or architectural RGB lighting as part of the electrical and control package. Final light type, quantity, location, voltage and control method are confirmed on the project equipment schedule.

Water features

Selected sheer-descent, waterfall or stainless water-feature pathways can be coordinated where the shell layout, hydraulics, splash zone and surrounding architecture suit the project.

Swim-assist + training current

Counter-current can be reviewed at two levels: recreational swim-assist or a higher-demand exercise / training pathway. Final flow, power and equipment-bay requirements depend on the selected system.

Owner care package

A project can include selected cleaning and routine-care equipment such as manual vacuum tools, skimming accessories, spare baskets and compatible automated cleaning equipment. Exact inclusions are confirmed with the order.

Cover family

Four cover pathways from simple manual protection to a moving deck.

A cover can affect power, edge geometry, travel clearances, decking and future service access. The exact cover system must also be checked against destination pool-safety requirements.

01Baseline

Manual / Roller Cover

Simple manual cover pathway with a project-matched storage or roller position. Edge details, handling and local pool-safety requirements still need planning.

02Powered

Automatic PVC Cover

Motorised flexible-cover pathway. Power, controls, roll / recess geometry, servicing and exact compatibility are confirmed with the selected pool.

03Premium powered

Automatic Slatted Cover

Retractable rigid/slatted cover pathway for projects wanting a more architectural powered closure. Slat material, recess, motor, controls, servicing and destination safety requirements are confirmed for the selected system.

04Architectural

Sliding WPC Deck Cover

Moving WPC deck-style closure on a structural support / rail pathway. Requires clear travel space, drainage, drive access and verified evidence for any structural or safety claim.

Planning-impact matrix

See which decisions affect the shell, water system, power and site.

This matrix shows coordination impact, not confirmed compatibility. Every selected option still needs final confirmation for the chosen Auremont size and project configuration.

OptionShell / layoutHydraulicsElectricalSite / deckDecision point
Acrylic viewing windowHighLowLowMediumBefore final shell CAD
WPC / exterior integrationLowLowLowHighBefore decks + landscaping
Baja shelf / shallow ledgeHighMediumLowLowBefore internal layout release
Pool + spa / dual zoneHighHighHighMediumEarly configuration
Counter-current systemMediumHighHighLowBefore equipment release
Pool lightingLowLowHighLowBefore electrical / shell release
Water featureMediumHighMediumMediumBefore shell + hydraulic release
Owner care packageLowLowLowLowBefore handover / order close
UV / salt pathwayLowHighMediumLowBefore equipment release
Integrated / buried filtrationLowHighMediumMediumBefore equipment + site freeze
Automatic backwashLowHighMediumLowBefore equipment release
Smart-control pathwayLowMediumHighLowBefore controls / equipment release
Automatic PVC / slatted coverMediumLowHighMediumBefore edge / services freeze
Sliding deck coverMediumLowMediumHighEarly site + deck planning

Configuration sequence

A cleaner order of decisions.

Following the sequence reduces late changes to the shell, equipment bay, services or surrounding deck.

01
Choose standard size

Start with one of the four current Auremont formats.

02
Set installation level

Above ground, recessed, deck-integrated or inground.

03
Choose architectural options

Viewing window, exterior / WPC treatment and finish direction.

04
Choose internal layout

Steps, Baja shelf, pool + spa and other internal zones.

05
Choose performance + experience

Counter-current level, lighting and water-feature intent.

06
Choose water pathway

Equipment layout, filtration, treatment, heating and automation intent.

07
Choose cover

Manual / roller, automatic PVC, automatic slatted or sliding WPC deck cover.

08
Resolve the site

Exposure, access, services, lifting and surrounding works.

Move into project configuration

Choose the options, then let the final project documents verify the package.

Need Apollo to review it?

Turn the result into a project brief.

Project