Commercial AC
Hotels, resorts, apartments, office parking and longer-dwell bays
- Single outlet, Type 2 socket or tethered cable
- RFID, billing and meter requirements
- Wall or pedestal configuration
- Shared site load allocation
Request project quoteCommercial charger selection
From shared destination bays to fast-charging infrastructure, AETREN starts with the site requirement. The power classes below are planning categories, not a claim that every rating or configuration is available as an approved AETREN product in every destination.
AETREN AC & DC
Select by vehicle dwell time, usage, simultaneous demand, power capacity and destination requirements—not maximum kW alone.
Hotels, resorts, apartments, office parking and longer-dwell bays
Shared bays, multi-residential developments, workplaces and destinations
Small commercial sites, dealerships, destinations and operational fleets
Public-facing locations, shorter stays and higher-turnover sites
Infrastructure, high-utilisation fleets and strategic charging hubs
For a usable quotation
We can shortlist a system faster when the brief includes these essentials.
Country, location, site type, exposure and required compliance.
Number of spaces, vehicle mix, dwell time and simultaneous charging.
Existing supply, transformer capacity, available power and any future upgrades.
Public/private use, RFID, app, payment, OCPP backend and reporting.
Required dates, quantities, procurement phase, supply-only logistics and appointed installer.
Project specifications
Use the AETREN schedule to identify the information required for a model-specific project quote.
Open specification scheduleStart an AETREN project
The final offer identifies selected equipment, proposed configuration and available manufacturer evidence. No blanket worldwide approval or universal software compatibility is implied.
Build project brief