Skip to main content
Apollo NZ Global
Get a QuoteMy Project
Start AETREN Brief
AETRENCharging Infrastructure Systems

International commercial charging programme

Charging infrastructure built around the site, not just the charger.

AETREN is Apollo NZ Global’s project-led charging infrastructure brand for commercial developments, hospitality, sports and venues, infrastructure and fleet applications. Initial market development is focused outside New Zealand, with model selection based on destination-specific certification, operating conditions and project requirements.

GCC · UK / Europe · selected international marketsWholesale + project supplyModel-by-model compliance review

Charger range planning

Compare commercial AC and DC charging classes.

Explore dual AC, destination charging, compact DC, fast DC and high-power infrastructure before specifying a manufacturer model.

Application architecture

Five commercial pathways. One technical qualification process.

The charging system changes with dwell time, parking behaviour, power availability, operating model and destination. These pages structure the project before a model is selected.

Commercial developments & mixed-use

EV charging for workplaces, retail, apartments and mixed-use developments.

Plan charging around dwell time, tenant and visitor use, parking allocation, electrical capacity and future growth rather than treating every bay as the same charging requirement.

Open pathway
Hospitality & resorts

EV charging for hotels, resorts and destination properties.

Hospitality charging should fit guest dwell time, arrival patterns, parking operations and the wider destination experience, with AC destination charging and selected faster charging reviewed as different use cases.

Open pathway
Sports & venue projects

EV charging for sports centres, stadiums, clubs and recreation venues.

Sports and venue car parks can combine long event dwell times, staff use, club activity and peak arrival periods. The charging plan should match those operating patterns rather than copy a retail or roadside model.

Open pathway
Development & infrastructure

EV charging for larger developments and infrastructure-led projects.

For larger residential, institutional, modular, remote and infrastructure projects, charging needs to be coordinated with the wider power, civil, parking and development strategy from the beginning.

Open pathway
Fleet & commercial charging

EV charging for depots, service fleets and commercial vehicle operations.

Fleet charging is driven by duty cycle, return-to-base time, vehicle utilisation, energy availability and uptime. Charger count and power should follow the operating schedule rather than headline output alone.

Open pathway

AETREN system architecture

Six clear pathways from destination charging to site energy.

These are system families rather than fixed charger specifications. Specific power ratings and configurations are confirmed for the selected project and destination.

AETREN AC

Commercial and destination charging for workplaces, residential developments, hospitality, venues and longer-dwell fleet parking.

AETREN DC

Fast-charging pathways for shorter dwell times, operational fleets, public-facing sites and strategic charging hubs.

AETREN FLEET

Fleet and depot charging structured around duty cycle, vehicle utilisation, return-to-base windows and site power.

AETREN SITE

Multi-charger infrastructure where bay density, electrical capacity, access control and future expansion shape the project.

AETREN CONTROL

OCPP, communications, dynamic load management and site-control pathways where supported by the selected charger platform.

AETREN ENERGY

Reserved future pathway for project-specific charging, solar and battery integration once the underlying systems are fully qualified.

Commercial selection matrix

Choose the operating model before the charger model.

Dwell time, duty cycle, site power and bay strategy determine the starting architecture. The matrix is a project-routing tool, not a substitute for electrical design or an exact charger specification.

AETREN AC

Destination / long dwell

Workplaces, apartments, hotels, resorts and venues where vehicles can remain parked for longer periods.

CONFIRM · Bay count · dwell window · access control · site power · load management

AETREN DC

Public / shorter dwell

Public-facing and commercial sites where faster turnaround is the primary charging requirement.

CONFIRM · Turnaround target · utilisation · electrical capacity · thermal environment · payment route

AETREN FLEET

Fleet / return to base

Depot and operational fleets structured around duty cycle, return windows, vehicle availability and energy demand.

CONFIRM · Duty cycle · return window · vehicle mix · dispatch priority · site control

AETREN SITE

Multi-bay development

Larger projects where charger quantity, power allocation, civil layout and future expansion must be planned together.

CONFIRM · Bay phasing · electrical headroom · cable routes · controls · future growth

Technical selection

Certification is a routing input, not a footnote.

The selected charger must match the certification, operating environment and destination requirements of the actual project.

01

Model-specific certification and issued evidence

02

Destination electrical and connector requirements

03

Ambient-temperature performance and thermal derating

04

OCPP / backend interoperability and site-management scope

05

Metering, RFID, payment and communications configuration

06

Warranty, support, spares and project documentation

Quote documentation

Eight items should accompany the selected charger in the quotation.

This keeps AC, DC, fleet and site-control information tied to the exact charger and project requirements.

01

Exact charger model, electrical ratings and connector configuration

02

Destination-specific certificates, declarations and required evidence

03

Operating-temperature, enclosure and environmental limits

04

OCPP / backend capability, version and integration responsibility

05

Metering, payment and user-access route where required

06

Load-management and site-control architecture

07

Installation, commissioning and local electrical responsibility

08

Warranty, service pathway, recommended spares and lifecycle support

AETREN project tools

Move from the site requirement into a controlled charging brief.

The tools keep the project at system-family level until evidence supports an exact charger model.

Phase 2 / model-specific evidence & project release

Every charger quotation must prove its actual destination fit.

AETREN charging pathways cover AC, DC, fleet, site and controls. Exact chargers require electrical and backend qualification before specification.

01

Charger identity & model evidence

Confirm: Request exact OEM/ODM charger code, revision, connector variants, enclosure drawings and genuine manufacturer technical documents.

Boundary: Model availability or factory release must be evidenced for the quoted charger.

02

Electrical & destination evidence

Confirm: Confirm AC/DC ratings, phase, connectors, protection, thermal/environmental limits, electrical certifications and destination-specific approval documents.

Boundary: A model offered in one country is not automatically certified in another.

03

Software / control interfaces

Confirm: Request the actual OCPP version, communications, backend interoperability, metering, payment, access control and dynamic load management evidence as applicable.

Boundary: Do not assume all AETREN chargers support every control feature.

04

Supply, installation & support

Confirm: Define commissioning, software responsibility, site power/grid works, warranties, maintenance, spares, manuals and remote support.

Boundary: Local licensed electrical designers and installers remain responsible for project electrical works and approvals.

The buyer's geography, vehicle duty cycle and electrical capacity determine the first system family. Hardware, protocol support, availability and certifications must be verified for the exact charger model and market.

AUTHORITY CONTENT

EV charging technical decision guides

Built from the same project inputs, evidence rules and technical boundaries as the Authority Centre.

Apollo supply scope

Product + technical coordination + international supply.

Apollo can coordinate the charger product, approved configuration, project documentation and agreed freight or delivery pathway.

Apollo pathway

Product selection, configuration review, technical documentation, manual quotation and supply coordination.

Local project pathway

Electrical design, grid connection, civil works, protection, cabling, installation, commissioning, permits and local statutory approvals remain with the appointed project team unless expressly included in writing.

Developing an AETREN project?

Start with the site, users, parking pattern and destination.

We can identify the right AETREN system family first, then match the exact charger to the technical, certification and operating requirements.

Start charging project brief
Project