AETREN AC
Commercial and destination charging for workplaces, residential developments, hospitality, venues and longer-dwell fleet parking.
Start AETREN BriefInternational commercial charging programme
AETREN is Apollo NZ Global’s project-led charging infrastructure brand for commercial developments, hospitality, sports and venues, infrastructure and fleet applications. Initial market development is focused outside New Zealand, with model selection based on destination-specific certification, operating conditions and project requirements.
Charger range planning
Explore dual AC, destination charging, compact DC, fast DC and high-power infrastructure before specifying a manufacturer model.
Application architecture
The charging system changes with dwell time, parking behaviour, power availability, operating model and destination. These pages structure the project before a model is selected.
Plan charging around dwell time, tenant and visitor use, parking allocation, electrical capacity and future growth rather than treating every bay as the same charging requirement.
Open pathway Hospitality & resortsHospitality charging should fit guest dwell time, arrival patterns, parking operations and the wider destination experience, with AC destination charging and selected faster charging reviewed as different use cases.
Open pathway Sports & venue projectsSports and venue car parks can combine long event dwell times, staff use, club activity and peak arrival periods. The charging plan should match those operating patterns rather than copy a retail or roadside model.
Open pathway Development & infrastructureFor larger residential, institutional, modular, remote and infrastructure projects, charging needs to be coordinated with the wider power, civil, parking and development strategy from the beginning.
Open pathway Fleet & commercial chargingFleet charging is driven by duty cycle, return-to-base time, vehicle utilisation, energy availability and uptime. Charger count and power should follow the operating schedule rather than headline output alone.
Open pathwayAETREN system architecture
These are system families rather than fixed charger specifications. Specific power ratings and configurations are confirmed for the selected project and destination.
Commercial and destination charging for workplaces, residential developments, hospitality, venues and longer-dwell fleet parking.
Fast-charging pathways for shorter dwell times, operational fleets, public-facing sites and strategic charging hubs.
Fleet and depot charging structured around duty cycle, vehicle utilisation, return-to-base windows and site power.
Multi-charger infrastructure where bay density, electrical capacity, access control and future expansion shape the project.
OCPP, communications, dynamic load management and site-control pathways where supported by the selected charger platform.
Reserved future pathway for project-specific charging, solar and battery integration once the underlying systems are fully qualified.
Commercial selection matrix
Dwell time, duty cycle, site power and bay strategy determine the starting architecture. The matrix is a project-routing tool, not a substitute for electrical design or an exact charger specification.
Destination / long dwell
Workplaces, apartments, hotels, resorts and venues where vehicles can remain parked for longer periods.
CONFIRM · Bay count · dwell window · access control · site power · load management
Public / shorter dwell
Public-facing and commercial sites where faster turnaround is the primary charging requirement.
CONFIRM · Turnaround target · utilisation · electrical capacity · thermal environment · payment route
Fleet / return to base
Depot and operational fleets structured around duty cycle, return windows, vehicle availability and energy demand.
CONFIRM · Duty cycle · return window · vehicle mix · dispatch priority · site control
Multi-bay development
Larger projects where charger quantity, power allocation, civil layout and future expansion must be planned together.
CONFIRM · Bay phasing · electrical headroom · cable routes · controls · future growth
Technical selection
The selected charger must match the certification, operating environment and destination requirements of the actual project.
Model-specific certification and issued evidence
Destination electrical and connector requirements
Ambient-temperature performance and thermal derating
OCPP / backend interoperability and site-management scope
Metering, RFID, payment and communications configuration
Warranty, support, spares and project documentation
Quote documentation
This keeps AC, DC, fleet and site-control information tied to the exact charger and project requirements.
Exact charger model, electrical ratings and connector configuration
Destination-specific certificates, declarations and required evidence
Operating-temperature, enclosure and environmental limits
OCPP / backend capability, version and integration responsibility
Metering, payment and user-access route where required
Load-management and site-control architecture
Installation, commissioning and local electrical responsibility
Warranty, service pathway, recommended spares and lifecycle support
AETREN project tools
The tools keep the project at system-family level until evidence supports an exact charger model.
AC versus DC, OCPP, load management, payment, thermal performance, compliance and local-work boundaries.
Open Technical Centre Project SelectorUse site type, bays, dwell time, turnaround, electrical capacity, access, backend and climate to identify the starting architecture.
Use Project Selector Capacity PlannerUse vehicle count, energy per vehicle, dwell window, simultaneous charging and project-entered power allocation to test a planning scenario before electrical design.
Open Capacity Planner Project Authority CentreCarry the charging brief through exact-model documentation, drawing status, specification clauses, RFP schedules and lifecycle planning.
Open Authority Centre Project BriefCapture destination, users, charging behaviour, site power, controls, climate, programme and local electrical responsibilities.
Build Project BriefPhase 2 / model-specific evidence & project release
AETREN charging pathways cover AC, DC, fleet, site and controls. Exact chargers require electrical and backend qualification before specification.
Confirm: Request exact OEM/ODM charger code, revision, connector variants, enclosure drawings and genuine manufacturer technical documents.
Boundary: Model availability or factory release must be evidenced for the quoted charger.
Confirm: Confirm AC/DC ratings, phase, connectors, protection, thermal/environmental limits, electrical certifications and destination-specific approval documents.
Boundary: A model offered in one country is not automatically certified in another.
Confirm: Request the actual OCPP version, communications, backend interoperability, metering, payment, access control and dynamic load management evidence as applicable.
Boundary: Do not assume all AETREN chargers support every control feature.
Confirm: Define commissioning, software responsibility, site power/grid works, warranties, maintenance, spares, manuals and remote support.
Boundary: Local licensed electrical designers and installers remain responsible for project electrical works and approvals.
The buyer's geography, vehicle duty cycle and electrical capacity determine the first system family. Hardware, protocol support, availability and certifications must be verified for the exact charger model and market.
AUTHORITY CONTENT
Compare AC and DC commercial EV charging by dwell time, daily energy, electrical capacity, vehicle mix, turnover, load management and operating model.
Read guide 02 · AETRENEarly-stage EV charging capacity planning using daily energy, charging window, simultaneity, port power, managed charging and future growth.
Read guide 03 · AETRENUnderstand static and dynamic EV charging load management, site caps, charging priorities, OCPP/backend control and fleet operating constraints.
Read guideApollo supply scope
Apollo can coordinate the charger product, approved configuration, project documentation and agreed freight or delivery pathway.
Product selection, configuration review, technical documentation, manual quotation and supply coordination.
Electrical design, grid connection, civil works, protection, cabling, installation, commissioning, permits and local statutory approvals remain with the appointed project team unless expressly included in writing.
Developing an AETREN project?
We can identify the right AETREN system family first, then match the exact charger to the technical, certification and operating requirements.
Start charging project brief