A practical specification toolkit for real project review.

Use these clauses, schedules and request templates before a tender, substitution or technical review becomes difficult to control. The toolkit keeps product identity, technical information, responsibilities, revisions, logistics and unresolved project conditions visible without treating a generic template as a final engineered specification.

01
clausesGeneric Specification Clauses

Copyable early-stage clauses for current information, technical documents, supply scope, substitutions, submittals, mock-ups, revision control, logistics, warranty and spares.

02
templateProduct Substitution Review Template

A structured comparison of specified requirements, proposed alternatives, supporting technical information, lifecycle support and declared deviations.

03
requestTechnical Document Request

A project-focused request schedule for the technical documents needed for the exact product and configuration.

04
schedulePre-Tender Coordination Schedule

A responsibility and project-information schedule that keeps confirmed, project-dependent and unresolved requirements visible before tender.

01 · Generic specification clauses

Copy the framework, then complete the project-specific requirement.

These clauses are deliberately generic. They are useful for early specifications, tender notes and procurement schedules where technical information and responsibilities need to remain visible.

01GENERAL SPECIFICATION WORDING

Current information clause

Product selection and specification shall be based on the current Apollo product page, current project quotation and current technical documents issued for the selected system. Superseded saved files should not be used where they conflict with current project information.

02GENERAL SPECIFICATION WORDING

Technical information clause

Where a project requires stated performance, certification or testing, use current technical information applicable to the exact product and configuration offered. Different sizes, materials, fixings or assemblies may require separate review.

03GENERAL SPECIFICATION WORDING

Supply-scope clause

Apollo's quoted scope is product supply and specifically stated supporting information. Site measurement, local engineering, foundations, civil or electrical works, installation and statutory approvals remain with the purchaser's appointed project team unless expressly included in writing.

04GENERAL SPECIFICATION WORDING

Alternative / substitution clause

Any proposed alternative shall demonstrate equivalent project suitability against the specified application, dimensions and interfaces, material and finish, technical documentation, warranty and spares, maintenance requirements and destination conditions. Price or visual similarity alone does not establish equivalence.

05GENERAL SPECIFICATION WORDING

Technical submittal clause

Technical submittals shall identify the exact product, model, material, finish and configuration offered and shall include the current project-relevant drawings, data sheets, test reports, certificates and other documents requested by the project team. Documents for a different model or configuration should be clearly identified.

06GENERAL SPECIFICATION WORDING

Samples and mock-ups clause

Where samples or mock-ups are required, the approved sample or mock-up shall establish the agreed visual, material or assembly reference for the project within its stated scope. Approval of appearance does not by itself establish structural, fire, weather, code or other performance compliance.

07GENERAL SPECIFICATION WORDING

Revision and change-control clause

Drawings, schedules and technical documents shall carry a revision or issue date. Any change to dimensions, materials, finishes, loads, interfaces, accessories or other project-critical information after approval shall be identified and reviewed before manufacture or procurement continues.

08GENERAL SPECIFICATION WORDING

Packaging and logistics clause

The quoted supply scope shall identify the agreed packaging method, crate or bundle identification, shipping dimensions and project handover point. Import clearance, onward transport, unloading, storage and site movement responsibilities shall remain with the party identified in the written project scope.

09GENERAL SPECIFICATION WORDING

Warranty and spare-parts clause

The supplied warranty, exclusions, maintenance conditions, claim pathway and responsible legal entity shall be identified before order. Where lifecycle support is material to the project, spare parts, replacement components and expected replacement lead times shall be confirmed separately.

These clauses are coordination tools, not legal advice. Final wording should be reviewed against the project contract, jurisdiction, specification structure and appointed professional responsibilities.

02 · Substitution review

Product Substitution Review Template

Use this when a proposed alternative is offered against a named or previously reviewed product. The comparison should test project suitability and supporting information, not simply price or visual similarity.

Review areaSpecified requirementProposed alternativeSupporting informationStatusReviewer comments
Product identityOpen
Application / intended useOpen
Dimensions / geometry / interfacesOpen
Material and finishOpen
Structural / performance criteriaOpen
Test reports / certificationOpen
Fixing / substrate / service interfacesOpen
Maintenance and cleaningOpen
Warranty and exclusionsOpen
Spare parts / replacement pathwayOpen
Lead time and manufacturing capacityOpen
Packaging / freight / receivingOpen
Local engineering / statutory reviewOpen
Declared deviations from the original requirementOpen

Equivalent-looking products are not automatically equivalent project substitutions. The appointed project team remains responsible for accepting or rejecting alternatives against the actual specification and local requirements.

03 · Technical document request

Technical Document Request

Use this to list the project-relevant technical documents needed for a particular product and configuration.

Document requirementExact product / configurationProject requirementRequired documentFile / referenceReview notesStatus
Product specificationCurrent datasheetRequested
Material / substrateMaterial informationRequested
Finish / coatingFinish data / certificationRequested
Structural performanceCalculation / test reportRequested
Wind / load performanceCalculation / test reportRequested
Fire performanceTest report / certificationRequested
Slip / impact / sports performanceTest reportRequested
Electrical / controlsTechnical / conformity documentRequested
Environmental / corrosion exposureMaterial / finish informationRequested
WarrantyCurrent warranty documentRequested
Installation requirementsCurrent installation manualRequested
Maintenance requirementsCurrent care / maintenance guideRequested

Request the documents that matter to the project and match them to the actual model, size, material, standard and configuration.

04 · Pre-tender coordination schedule

Pre-Tender Coordination Schedule

Use this before tender issue to identify what is confirmed, what remains project-dependent and who owns each unresolved requirement.

RequirementProject requirement / referenceAvailable technical informationLocal project-team inputStatusTender note / action
Product / system identityOpen
Dimensions / configurationOpen
Material / finishOpen
Design loads / structural criteriaOpen
Wind / seismic / weather exposureOpen
Fire requirementsOpen
Electrical / controls requirementsOpen
Accessibility / circulation interfacesOpen
Foundation / substrate / fixing interfaceOpen
Drainage / services interfaceOpen
Technical documents / certificatesOpen
Samples / mock-upsOpen
Installation responsibilityOpen
Local engineering / statutory approvalsOpen
Freight / delivery handoverOpen
Unloading / storage / site movementOpen
Warranty / maintenance / sparesOpen
Programme / lead timeOpen
Commercial exclusions / qualificationsOpen
Final tender return requirementsOpen

The schedule is designed to keep unresolved items visible before tender. It does not certify compliance and does not replace review by the project's appointed professionals.

Recommended project workflow

Use the toolkit in sequence when the project needs clearer coordination.

01Define the requirement

Start with the project brief, current drawings and the actual performance or procurement question.

02Request the right documents

Ask for documents that apply to the quoted model and configuration rather than a generic certificate folder.

03Review substitutions and submittals

Record deviations, applicability and unresolved local-project responsibilities before acceptance.

04Close the pre-tender gaps

Use the coordination schedule to show what is confirmed, what is project-dependent and who owns the next action.

Continue the professional workflow

Connect the toolkit to Apollo's current technical information and project tools.

Technical Document Guide Specification & Tender Guide Procurement Templates Project Resources & Templates Upload Project Documents Build Tender / Spec Pack
Project