01Commission the installed system, not a generic specification
Check the pool, equipment, controls, heating, treatment and selected options against the final supplied configuration. Current project drawings, equipment schedules and manuals should guide handover rather than generic website information.
02Protect equipment access for the life of the pool
Decking, landscaping and screening should preserve inspection, isolation, cleaning and component-replacement access around the equipment bay and other maintainable interfaces.
03Keep care instructions tied to the actual finish and options
FRP surfaces, acrylic viewing windows, automatic covers and sliding deck covers can require different care. Use the current instructions for the supplied component rather than assuming one cleaning or service method applies to every option.
04Treat coastal exposure as an ongoing maintenance condition
Coastal, island and high-humidity projects should include routine inspection of exposed finishes, fasteners, equipment enclosures, drainage and any locations where salt or moisture can accumulate.
05Keep one controlled handover record
Retain approved drawings, quotation, equipment references, manuals, warranty information, commissioning notes and later service records together so future maintenance can identify what was originally supplied and what has changed.