Skip to main content
Apollo NZ GlobalStart Water Project Brief
RHELGAN Water Systems

RHELGAN · RAPID STORAGE

Flexible Water Storage

Collapsible pillow, bladder and self-supporting storage pathways for emergency response, temporary camps, field operations and short-to-medium-duration water infrastructure.

01DEPLOY
02GROUND PROTECTION
03CONNECT
04FILL
05DISTRIBUTE
06PACK / REDEPLOY

Direct project answers

What project teams need to know about Flexible Water Storage.

A concise planning and evidence layer for early specification and project review.
01

What is RHELGAN Flexible Water Storage?

Collapsible pillow, bladder and self-supporting storage pathways for emergency response, temporary camps, field operations and short-to-medium-duration…

02

What projects are suitable for flexible emergency water storage tanks?

Typical project pathways include disaster response, temporary camps, recovery programmes, and field infrastructure. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.

03

What information is needed to specify flexible emergency water storage tanks?

Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.

04

Can Apollo NZ Global supply flexible emergency water storage tanks internationally?

Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.

Where it fits

Applications that benefit from this pathway.

Emergency responseTemporary accommodationField operationsTemporary clinics and schoolsConstruction / recovery sitesContingency water storage

Selection factors

Define these before equipment is fixed.

01

Required volume

02

Potable / non-potable use

03

Fabric and liner evidence

04

Ground condition

05

Temperature and UV exposure

06

Chlorine compatibility

07

Fitting schedule

08

Packed size and handling

09

Repair and cleaning method

Specification controls

Keep the public pathway useful without turning planning data into guarantees.

Potable-water use requires exact material and finished-system evidence.

Groundsheet, fittings, hoses and repair kit are part of the deployment package.

Maximum fill height, handling and site preparation follow the exact tank design.

Repeated deployment requires inspection, cleaning and repair records.

Working resources

Carry this section through design, procurement and handover.

Project note

Flexible storage should be evaluated as deployable equipment, not a permanent rigid tank substitute. Fabric, seams, fittings, ground conditions, water chemistry and operating duration all matter.

Final equipment, material, capacity, certification, drawings, performance and commercial scope are confirmed against the exact project configuration.

RHELGAN · WATER STORAGE & SUPPLY SYSTEMS

Use the project brief to turn the requirement into a technical handoff.

Start Water Project Brief Upload project documents
Project