FIXED system anatomy
Permanent aluminium roof, perimeter structure, integrated drainage and lighting form one coordinated shelter system.
Plan a FASGAR ProjectFASGAR Technical Centre
Compare dimensions, roof formats, controls, lighting, frame options and project inputs for FASGAR FIXED and FASGAR RETRACT.
Back to FASGARFASGAR · system diagrams
These are Apollo planning diagrams, not supplier shop drawings. Final sections, spans, fixing points, motors, drainage outlets and structural details are confirmed for the selected project.
Permanent aluminium roof, perimeter structure, integrated drainage and lighting form one coordinated shelter system.
The membrane extends for overhead shelter and stacks back to recover a substantially open roof condition.
Membrane, rails, gutters and posts must be coordinated around the roof area and local discharge strategy.
Freestanding, wall-mounted and built-in/inset projects create different structural and waterproofing interfaces.
Best where consistent overhead protection and architectural permanence matter more than opening the roof.
Open FIXEDBest where the project needs overhead shelter that can retract to recover an open-sky condition.
Open RETRACTReference data
Current fixed-roof platform reference.
Current manufacturer listing; final structure remains project-specific.
Built-in drainage and app-controlled LED/RGB lighting are currently published.
Current retractable-roof platform reference.
Published maximum-width range.
Published maximum-projection range.
Current published aluminium-post options.
Current published rail reference.
Current published gutter options.
Current voltage pathways; motor make and IP remain quote-confirmed.
Current product reference.
Current published pathway.
Compatible screen reference; VELARIS remains Apollo's dedicated blind brand.
Current published colour references.
Configuration options
Current hero and primary FASGAR FIXED reference; related fixed-roof configurations remain project-selected.
Final fixing and support interfaces remain project-specific.
Exact driver, control and electrical configuration remain project-confirmed.
Current product reference; motor specification, IP rating and integration are confirmed for the selected configuration.
Current published pathway.
VELARIS Outdoor Blind Systems provide the dedicated side-screen pathway.
Other colours/finishes require project confirmation.
Final voltage/frequency and electrical installation are destination-specific.
Project evidence checklist
FASGAR uses two fundamentally different roof families. Project teams should match structural, membrane, drainage, electrical, finish, installation and warranty evidence to the exact quoted family and configuration rather than carrying one system's data into the other.
Confirm whether the order is FASGAR FIXED or FASGAR RETRACT, then use the corresponding current profile, roof and accessory schedule.
Fixed aluminium-roof data and retractable fabric-roof data are not interchangeable.
Match current engineering calculations or test evidence to the selected width, projection, post/rail layout, fixings and project loads.
Wind, snow, substrate, foundations and local structural requirements remain project-specific.
Confirm the exact PVC membrane construction, mass/thickness, finish and any applicable fire/weather evidence for the quoted membrane.
A membrane property or certificate should not be extended to another fabric, colour or build-up unless it is within the documented scope.
Confirm gutter sizes, roof fall/geometry, outlet positions and final site discharge route for the selected configuration.
Rainfall intensity, projection, outlet strategy and local thresholds can change the required drainage design.
Confirm the exact motor, voltage/frequency, controller, remote zoning, ingress rating and any sensor/app integration supplied.
The published 110 V / 230 V pathway does not by itself establish destination electrical compliance.
Confirm LED type, colour pathway, drivers, switching/control and local electrical interfaces for FIXED or RETRACT.
Lighting and motor circuits should be coordinated with the final roof and destination electrical requirements.
Confirm aluminium finish, frame colour, hardware, membrane colour and maintenance requirements for coastal, high-UV or high-rainfall exposure.
Finish selection and warranty conditions should follow the actual environment rather than a generic colour choice.
Use current installation, commissioning, maintenance and warranty information plus released shop drawings and packing schedule.
Local foundations, electrical connection, drainage discharge, lifting, assembly and approvals remain separately defined.
Project brief checklist
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Include this where known; early-stage projects can proceed with partial information.
Technical project review
Send the site, dimensions, roof intent and exposure so the configuration can be matched to the project.
Start FASGAR Project Brief