AUVENOR · PROJECT AUTHORITY CENTRE

Move from product interest to a controlled project specification.

Coordinate retractable louvre roofs, tilt-roof systems and integrated side enclosure around span, structural profile, roof movement, drainage, lighting, blinds, power, wind/environment and exact-system evidence.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

Roof-system pathway: retractable louvre, tilt roof or heavy-duty tilt

02

Plan dimensions, post count and required clear opening

03

Blade/roof movement objective and parking geometry

04

Integrated blinds/screens and enclosure intent

05

Lighting and other electrical/control requirements

06

Rainwater, gutter and discharge route

07

Wind, coastal/salt and other environmental exposure

08

Foundation/fixing/substrate, freight and installation responsibility

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Exact profile/member dimensions for quoted configuration

02

Exact blade/span limits and structural evidence

03

Motor/control documentation

04

Integrated blind/screen compatibility

05

Drainage/gutter details

06

Coating/corrosion suitability

07

Wind/project engineering evidence and exact-system drawings

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
AUVENOR roof / enclosure concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

System pathway and roof movement

02

Plan geometry/post arrangement

03

Structural profiles and limits

04

Drainage/rainwater route

05

Integrated blinds/enclosure

06

Lighting/power/controls

07

Wind/environment criteria

08

Foundation/fixing scope

09

Evidence/warranty/maintenance

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Project/site plan

02

Required dimensions

03

System pathway

04

Post/clear-opening priorities

05

Blinds/enclosure

06

Lighting/controls

07

Wind/environment

08

Drainage

09

Foundation/fixing

10

Evidence/drawings/freight

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Roof/moving-blade inspection

02

Track/drive maintenance

03

Integrated blind maintenance

04

Drainage cleaning

05

Lighting/control service

06

Fastener/connection inspection

07

Coating/coastal maintenance

08

High-wind operating procedure

AUTHORITY GUIDES

Go deeper on the decisions that usually control the project.

These guides sit below the owner page and above exact product selection, so search, specification and project planning all point to the same technical logic.

01

Retractable louvre vs tilt-roof systems.

Compare AUVENOR retractable-louvre and tilt-roof pathways by opening behaviour, parked geometry, shade, rain control, structure, enclosure and controls.

Read guide
02

Integrated outdoor enclosure planning.

Plan roof, blinds, screens, glazing, lighting and controls as one AUVENOR outdoor enclosure around posts, drainage, movement, wind and service access.

Read guide
03

AUVENOR roof movement, drainage and controls.

Coordinate moving roof geometry, motors, controls, rainwater, gutters, integrated lighting, sensors and maintenance for AUVENOR architectural systems.

Read guide

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.

Project