Project countryNot supplied
Facility / buyer typeSports club / venue
Project pathwayNot sure — review required
Primary field sportNot sure — select sport
Intended field pathwayNeed recommendation
Federation / tender requirementNo formal requirement confirmed yet
Field / available site dimensionsNot supplied
Secondary / shared usesNot supplied
Existing site / base conditionNot sure
Drainage statusNeeds project review
Hockey water / irrigation strategyNot applicable / no irrigation expected
Surface directionNeed recommendation
Shockpad / impact layerConfirm against exact system
Line-marking requirementNot supplied
Goals / posts / field equipmentInclude equipment review
Perimeter / ball containmentReview perimeter and access
Sports lightingInclude project-lighting review
Player / spectator infrastructureBasic player + spectator review
Field technologyNeed recommendation
Maintenance capabilityNeed maintenance plan and equipment guidance
Local installation / testing pathwayNeed local installer / testing plan
Civil / base works responsibilityNot appointed / not confirmed
Turf installation responsibilityNot appointed / not confirmed
Lighting / electrical responsibilityNot applicable / not confirmed
Finished-field testing responsibilityNot appointed / not confirmed
Drawings / technical information availableBasic site information only
Project files ready to shareNot supplied
Project stage / target timingNot supplied
Climate, exposure, operating and project notesNot supplied
Destination *Not supplied
Quantity / scale *Not supplied
Multi-site / staged procurementNot supplied
Freight & receivingNot supplied
Before final reviewThis project brief is for information gathering only. It does not generate a price, estimate or quotation. Apollo reviews the complete project before deciding the appropriate commercial response.
ATHREN FIELD is a project pathway, not a certification transfer. Any FIH, FIFA, World Rugby or ITF requirement must be matched to the exact underlying product/system and finished-field process where applicable.
Base condition, levels and drainage should be resolved before the surface package is frozen. Turf cannot correct unsuitable civil work.
Shockpad, infill, water strategy and maintenance are exact-system decisions rather than interchangeable accessories.
Apollo is supply-only. Local civil works, electrical work, installation, field testing and statutory approvals remain project-specific unless expressly included in writing.
This brief organises project information for manual Apollo review. It does not calculate price, approve engineering, certify compliance or transfer local design and installation responsibilities.