Skip to main content
Apollo NZ GlobalPlan an ARKEN Project
ARKENArchitectural Louvre Systems

ARKEN Technical Centre

Reference data for early system selection and project planning.

ARKEN is Apollo NZ Global's premium architectural louvre platform. Use this technical centre to compare system pathways, reference dimensions, configuration options and the information needed for a project brief. Final project specifications are confirmed against the selected system and current project documentation.

Back to ARKEN
System familyOne coordinated ARKEN system

Roof structure, movement hardware and compatible accessories are selected as one integrated ARKEN configuration.

EnclosureARKEN-compatible interfaces only

Glass and guided-screen options are limited to products designed to coordinate with the selected ARKEN roof system.

Water managementDesigned as part of the roof

Louvre channels, beam gutters, drainage posts and site discharge are planned as one continuous water route.

Project releaseFinal configuration is project-specific

Dimensions, structure, controls, finishes and local requirements are confirmed before manufacture.

ARKEN · technical drawing set

System logic drawn like architecture — not catalogue graphics.

These drawings are clean planning references built around the current ARKEN system geometry. They explain movement, structure, water management, enclosure and bay planning in one consistent technical language. Final shop drawings and engineering remain project-specific.

A-01
ARKEN TECHNICAL REFERENCE

System anatomy

Primary roof components, structural zones and concealed water route in one coordinated view.

ARKENREFERENCE / NOT FOR CONSTRUCTION
REFERENCE SPAN / PROJECT SPECIFICOVERALL HEIGHT / PROJECT SPECIFICROTATING LOUVRE BLADEDRIVE / MOTOR ZONEPERIMETER BEAM + GUTTERSTRUCTURAL POSTCONCEALED WATER ROUTEIndicative component relationship · dimensions confirmed to selected ARKEN model
A-02
ARKEN TECHNICAL REFERENCE

Rotate + retract open-sky sequence

The flagship system can close, rotate, retract toward one side, or use a selected centre-opening arrangement.

ARKENREFERENCE / NOT FOR CONSTRUCTION
01 · CLOSEDoverhead shelter02 · ROTATEDlight + ventilation03 · SIDE RETRACTopen-sky condition04 · CENTRE OPEN*panoramic openingMotorised roof logic · *centre-opening is a selected configuration · exact stack zones and opening geometry are project-confirmed
A-03
ARKEN TECHNICAL REFERENCE

Rainwater route + beam section

Closed blades collect water into the roof field, perimeter gutter and nominated drainage post.

ARKENREFERENCE / NOT FOR CONSTRUCTION
LOUVRE WATER CHANNELPERIMETER BEAM GUTTERCONCEALED POST DRAINSITE DISCHARGEWater path shown diagrammatically · outlet quantity and discharge route resolved for project rainfall conditions
A-04
ARKEN TECHNICAL REFERENCE

Installation configurations

Freestanding, attached, inset and linked multi-bay arrangements use different structural interfaces.

ARKENREFERENCE / NOT FOR CONSTRUCTION
FREESTANDINGATTACHEDINSET / RETROFITMULTI-BAYSupport, fixing, flashing, drainage and electrical interfaces vary with installation condition
A-05
ARKEN TECHNICAL REFERENCE

Integrated enclosure interface

Glass and guided-screen zones are coordinated with the selected ARKEN structure before manufacture.

ARKENREFERENCE / NOT FOR CONSTRUCTION
GUIDED SCREEN ZONESLIDING GLASS PANELSTHRESHOLD + DRAINAGEBEAM / TRACK INTERFACEOnly ARKEN-compatible enclosure components are coordinated into ARKEN configurations
A-06
ARKEN TECHNICAL REFERENCE

Reference bay planning

Published planning references show post count and bay logic before final structural engineering.

ARKENREFERENCE / NOT FOR CONSTRUCTION
6.0 m4.0 m4 × 6 m · 4 POST10.0 m4.0 m4 × 10 m · DUAL BAY / 6 POST4.5 × 7 m · 4 POST9 × 6.5 m · 6 POST REFERENCE

System selection matrix

Choose the engineering pathway from the project requirement.

Start with the way the space needs to perform, then resolve bay size, movement, enclosure and exposure around the selected ARKEN system.

01 · ARKEN pathwayARKEN ROTATE

Variable project platform
Premium motorised rotating-louvre foundation for controlled shade, ventilation and closed-roof rain management without full roof retraction.

02 · ARKEN pathwayARKEN SPAN

4 × 6 m single · 4 × 10 m dual / 6 posts
Reduced-column pathway for wider views, larger openings and fewer posts.

03 · ARKEN pathwayARKEN STORM

4.5 × 7 m / 4 posts · 9 × 6.5 m / 6 posts
Heavy-duty rotating pathway where larger bays and rain-management geometry are key project drivers.

04 · ARKEN pathwayARKEN OPEN

Retract-only or flagship 4 × 6 m / 4-post rotate + retract reference
Physical open-sky pathway when blade rotation alone is not enough; exact mechanism is selected around the project requirement.

05 · ARKEN pathwayARKEN INSET

Existing structure dependent
Inset / retrofit pathway for integrating a compatible operable roof into a suitable existing engineered frame.

06 · ARKEN pathwayGlass-enclosed

Panels up to W1000 × H2600 mm
Use when greater side-weather separation is required while retaining daylight and views.

Reference data

Useful dimensions and system details for project planning.

These figures are current ARKEN planning references. They help establish feasibility before the project-specific configuration is released.

01 · Retractable roof reference4000 × 6000 mm · four posts

Current ARKEN open-sky reference; custom project configurations remain subject to engineering.

02 · ARKEN OPEN posts150 × 150 × 2.5 mm

Current ARKEN OPEN platform reference.

03 · Retractable beam + gutter200 × 208 × 2.0 mm

Current published reference.

04 · Retractable blade210 × 45 × 2.0 mm

Current published reference.

05 · Retractable operation0–90° rotation + roof retraction

Motorised roof pathway.

06 · Open-sky arrangementsSide retraction · centre-opening pathway

Current ARKEN OPEN pathway; exact opening direction and mechanism are confirmed against the selected project configuration.

07 · Motor ingress referenceIP44

Current published platform rating; final motor model and destination voltage remain quote-confirmed.

08 · Selected motor-voltage pathway110 V / 230 V

Published on selected current motorised louvre platforms; exact motor, certification and destination supply remain project-confirmed.

09 · Selected remote zoning1-channel / 5-channel

Published remote-control pathway on selected motorised platforms; exact channel allocation depends on the quoted roof and accessories.

10 · Selected white-light reference3000 K warm · 4000 K white

Current supplier literature also publishes RGB perimeter-lighting pathways on selected systems; final LED, driver and control package is project-confirmed.

11 · Retractable installationFreestanding · wall-mounted · fit into existing structure

Current ARKEN open-sky installation pathway.

12 · Retractable finish pathwayAkzoNobel surface-treatment reference

Current manufacturing information publishes a 40–80 μm powder-coat thickness range; exact pretreatment, coating build-up and coastal warranty remain project-confirmed.

13 · Factory preparationPre-cut / pre-drilled · pre-assembled and tested

Supplier-published preparation pathway before shipment; final packing and installation sequence remain order-specific.

14 · ARKEN SPAN reference4 × 6 m single · 4 × 10 m dual / 6 posts

Current ARKEN SPAN platform reference.

15 · ARKEN SPAN controlsMotorised · selected smartphone control

Primary ARKEN SPAN operation pathway; final controls are project-confirmed.

16 · Reduced-column sealingBuilt-in louvre rubber seals

Current ARKEN reference positions these for improved rain control and reduced wind vibration.

17 · ARKEN STORM reference4.5 × 7 m / 4 posts · 9 × 6.5 m / 6 posts

Current ARKEN STORM platform reference.

18 · Heavy-duty drainage designWider blade gutters + wider beam gutters

Current heavy-duty platform is specifically positioned for increased drainage capacity in rainy climates.

19 · Frameless glass panelUp to W1000 × H2600 mm

Current product reference.

20 · Glass build-ups10 / 12 mm tempered · 5 + 1.14 PVB + 5 mm laminated

Current ARKEN reference; final destination safety requirements control.

21 · Glass frame coloursRAL 7016 grey · RAL 9016 white

Current frame-colour references; project-specific finish confirmation still applies.

22 · Dual-layer guided screenW680–4000 mm · H up to 3000 mm

Current manufacturing reference for the selected dual-layer screen pathway; final opening size and ARKEN interface require project confirmation.

23 · Retractable insect screen6063-T5 aluminium frame · polyester mesh

Selected sliding/retractable perimeter pathway for insect control; exact track, threshold and opening interface remain project-specific.

Configuration options

Choose operation, enclosure, lighting and layout around the project.

Only compatible ARKEN accessories are coordinated with the roof package, reducing interface risk between structure, movement, drainage and enclosure.

01 · OperationMotorised · remote · selected smartphone control

The primary ARKEN range is motorised. Manual operation can be reviewed only where a specific project requires it.

02 · Smart app pathwayTuya-based smartphone control on selected motorised platforms

Current ARKEN control documentation supports app control for roof operation and, on compatible configurations, coordinated control of lighting and blinds. Exact controller compatibility remains project-confirmed.

03 · Smart-home integrationWired building-control pathway on selected configurations

Current manufacturing literature supports selected smart-home and voice-control pathways. Protocol mapping, gateway hardware and destination compatibility require confirmation.

04 · LightingWarm integrated LED · RGB perimeter pathways

Exact layout, driver and controls remain configuration-specific.

05 · Lighting colour pathwaysSelected 3000 K warm · 4000 K white · RGB

Current manufacturing references vary by platform. Exact strip, colour temperature, zoning, drivers and controls are confirmed for the selected ARKEN configuration.

06 · Motor voltageSelected 110 V / 230 V pathway

Destination voltage, motor certification, transformer/control hardware and electrical connection are confirmed before manufacture.

07 · Remote zoningSelected 1-channel / 5-channel pathway

Can support simpler single-zone operation or selected multi-zone control; exact assignment depends on the roof and accessory package.

08 · InstallationFreestanding · wall-mounted · inset / retrofit

Existing-frame projects require interface review before release.

09 · EnclosureARKEN-compatible sliding glass · guided screens · selected insect screens

ARKEN uses only enclosure products designed to coordinate with the selected roof system; unrelated third-party components are not assumed to fit.

10 · Heating + fansSelected project integration pathway

Commercial and hospitality project references include heaters and ceiling fans. Power, mounting, heat clearance, fan sweep and local electrical requirements are resolved project by project.

11 · FinishPowder-coated aluminium · current AkzoNobel pathway

Exact RAL palette, pretreatment, film thickness and coastal warranty remain project-confirmed.

12 · LayoutSingle bay · reduced-column · multi-bay

Final post count, beam size and structural layout depend on the selected engineering pathway.

13 · Open-sky directionSide retraction · centre-opening pathway

Opening direction is selected around views, sun, adjacent walls, services and final roof geometry.

14 · Project supportInstallation instructions · 3D tutorial pathway · remote technical support

Current supplier support pathway; local installation and project-site responsibilities remain separately defined.

15 · Environmental sensingOptional wind / rain sensor pathway

Supplier information references automatic rain response and high-wind blind protection on compatible configurations; exact sensor, control logic and destination compatibility are confirmed before order.

16 · Commercial large-opening shadeRoute to VELARIS where façade-scale screening is required

Large-format commercial blind systems can add wall switch, remote, app, grouped and selected building-management control. These are treated as a separate project blind system rather than a standard ARKEN side screen.

17 · Outdoor kitchen add-on304 stainless modular kitchen pathway

Current compatible kitchen options include grill/cooking, sink-cabinet and refrigerator-cabinet pathways, with selected pizza-oven / multi-fuel variants. Services, heat clearances and appliance compliance are project-specific.

Project evidence checklist

Match the evidence to the exact roof before the specification is frozen.

ARKEN planning references help narrow the system. Active projects should then match the structural, drainage, electrical, finish, enclosure and warranty evidence to the exact quoted configuration rather than extending one platform's data across the whole range.

01 · Evidence areaSystem identity + geometry

Match the exact ARKEN pathway, bay layout, profile schedule and final dimensions to the quoted configuration.
A dimension or profile from OPEN, SPAN or STORM should not be assumed to apply to every ARKEN roof.

02 · Evidence areaStructural basis

Confirm current calculations, design assumptions or test evidence for the selected spans, post layout, supports, fixings and project loads.
Site wind, snow, seismic, substrate and foundation requirements remain project-specific.

03 · Evidence areaWater management

Confirm louvre channels, beam gutters, post drainage, outlet positions and the intended site discharge route for the selected layout.
Drainage capacity and discharge depend on roof geometry, rainfall intensity, outlet strategy and local interfaces.

04 · Evidence areaMotor + controls

Confirm the exact motor, voltage/frequency, ingress rating, controller, remote/app pathway and sensor compatibility for the order.
Published platform references do not establish destination electrical compliance by themselves.

05 · Evidence areaFinish + coastal exposure

Confirm aluminium pretreatment, powder-coat system, film build-up, colour, stainless hardware and maintenance/warranty conditions.
Coastal or high-salt projects require an exposure-specific finish and maintenance review.

06 · Evidence areaGlass + screens

Match glass build-up, panel size, tracks, thresholds, guided screens and insect-screen interfaces to the selected roof and local safety requirements.
Perimeter systems are coordinated components, not automatically interchangeable third-party add-ons.

07 · Evidence areaInstallation + commissioning

Use the current assembly, fixing, electrical, drainage, commissioning and maintenance information for the final roof package.
Local foundations, electrical connection, drainage discharge, access, lifting and approvals remain separately managed.

08 · Evidence areaWarranty + project documents

Confirm the warranty scope, exclusions, maintenance requirements, packing schedule, shop drawings and order-specific bill of materials.
The project quotation and released drawings control where they differ from earlier planning information.

Request ARKEN technical information

Project brief checklist

Information that lets Apollo select the right ARKEN pathway faster.

Early-stage projects do not need a complete consultant package. Clear dimensions, site conditions and the intended roof behaviour are enough to begin system selection.

01 · Project inputCountry / destination and project type

Include this where known; early-stage projects can proceed with partial information.

02 · Project inputOverall width × projection × desired height

Include this where known; early-stage projects can proceed with partial information.

03 · Project inputSingle-bay or multi-bay intent

Include this where known; early-stage projects can proceed with partial information.

04 · Project inputFreestanding, wall-mounted, inset or retrofit

Include this where known; early-stage projects can proceed with partial information.

05 · Project inputPreferred range: ROTATE, SPAN, STORM, OPEN or INSET

Include this where known; early-stage projects can proceed with partial information.

06 · Project inputFor retractable roofs: preferred side-retract or centre-opening behaviour

Include this where known; early-stage projects can proceed with partial information.

07 · Project inputWind, coastal, snow, heavy-rain or high-heat exposure

Include this where known; early-stage projects can proceed with partial information.

08 · Project inputDrainage discharge route and surrounding thresholds

Include this where known; early-stage projects can proceed with partial information.

09 · Project inputPower availability, controls and lighting preference

Include this where known; early-stage projects can proceed with partial information.

10 · Project inputSmartphone / remote / smart-home integration preference

Include this where known; early-stage projects can proceed with partial information.

11 · Project inputRain / wind sensor automation preference

Include this where known; early-stage projects can proceed with partial information.

12 · Project inputARKEN-compatible screens, glass or insect screening now / later

Include this where known; early-stage projects can proceed with partial information.

13 · Project inputHeating / ceiling-fan requirement and available power

Include this where known; early-stage projects can proceed with partial information.

14 · Project inputOutdoor kitchen intent: cooking type, sink, refrigeration, gas/fuel, water and power requirements

Include this where known; early-stage projects can proceed with partial information.

15 · Project inputFinish direction, site photos, drawings and target programme

Include this where known; early-stage projects can proceed with partial information.

Technical project review

Need a specification for an active project?

Send the project brief to develop the roof configuration, controls, finish and project requirements.

Start ARKEN Project Brief
Project