A 3×3 facility is not simply half a basketball court. Permanent community courts, commercial-social venues and event courts need their own footprint, drainage, equipment, lighting, scoring, circulation and operational strategy.
PROJECT INTENT
Permanent participation court with durable outdoor surface, backstop and practical lighting.
Club / social court with spectator edge, scoring and repeat operating model.
Competition court with exact approved surface/equipment, shot clock and event zoning.
Broadcast/event court with temporary infrastructure, media, audience, display and rapid installation/changeover.
TECHNICAL REQUIREMENTS
Use the 15 × 11 m formal playing surface and the dedicated 18 × 14 m 3×3 footprint as different planning controls rather than simply cutting a 5-on-5 hall in half. Protect scorer, player, spectator and event-service zones outside the playing surface.
Outdoor systems should be checked for UV weathering, wet slip, permeability / drainage, thermal expansion and base tolerance. Where sufficient drainage is not possible, the FIBA Venue Guide allows a slight single-plane slope of up to 1%; for impermeable systems it gives a guide of no more than 5 mm undulation under a 3 m straightedge.
Backstop geometry, board/ring, padding and anchoring or ballast must match the exact permanent or event system. Where FIBA approval is required, verify the exact current product and competition level in the approved catalogue.
Community lighting and broadcast/event lighting are different briefs. The FIBA Venue Guide uses 100 lux as an ordinary outdoor visibility reference where regular broadcasting is not anticipated and 1200 lux minimum across the playing area for competitions with broadcasting demands; full design still requires glare, uniformity, spill and camera review.
Protect the player boundary while creating close spectator energy. Temporary barriers, seating, fan zones and accessible viewing need defined offsets.
Review pole/foundation or temporary support conditions, scoreboard/display supports, shade/cover and wind exposure.
Outdoor courts need solar orientation, heat expansion, wind, rain and stormwater planning. Avoid tree debris and uncontrolled runoff onto the playing area.
Provide accessible court approach, ramped tile edges where required, inclusive player access and accessible spectator positions.
Event tiles, barriers, backstop components, shot clocks and furniture require transport cases, dry storage, handling routes and an installation sequence.
Treat the 12-second shot clock, scoring, PA, FÍSVOR event display, streaming/camera and content-control systems as one event layer with clear power/data ownership.
Confirm exact FIBA 3×3 Approved surface/equipment where the competition brief requires it; keep product approval separate from local base, electrical and structural work.
Inspect tile movement, edges, drainage, surface wear, backstop stability, pads, fasteners, clocks, cables and spare parts on a defined schedule.
PROJECT INPUT SCHEDULE
Permanent or event court
Competition level
Available footprint
Base and drainage
Surface pathway
Backstop / anchoring method
Lighting hours / broadcast need
Shot clock / scoring / display
Spectator and barrier plan
Storage / transport / installation model
DRAWING & SUBMITTAL ROADMAP
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
Planning reference first. Exact fabrication, foundation, fixing or selected-system drawings follow after system verification.
EVIDENCE & RELEASE
Defines sport or competition requirements. It does not approve a supplier or local construction detail.
Testing, approval, certification or manufacturer evidence must match the selected product/configuration.
Where applicable, field/court/facility certification relates to the completed installation rather than the product alone.
Foundations, structural supports, wind/seismic, electrical and building interfaces remain project-specific.
Quantity, documentation, warranty, freight, installation boundaries, spares and handover are closed before order.
MAINTENANCE & HANDOVER
Surface cleaning
Drainage inspection
Tile edge / expansion checks
Backstop and padding checks
Shot-clock functional test
Lighting inspection
Event hardware inventory
TECHNICAL RISK CHECK
Check base falls, permeability, blocked drainage and local surface undulation.
Check expansion allowance, edge restraint and installation temperature.
Check anchoring/ballast, base level and hardware.
Check surface condition, contaminants and approved outdoor slip characteristics.
Check position, sun angle, brightness and spectator/player sightline.
Map component packing, court sequence, handling equipment and crew roles.
PRIMARY GOVERNING REFERENCES
Outdoor basketball and 3×3 planning guidance covering footprint, flooring, drainage, equipment and lighting.
Current 3×3 equipment appendix covering the playing surface, boundary space and sports-functional requirements.
Current catalogue of approved 3×3 backstop systems with competition level and licence information.
SUPPLY BOUNDARY
Local design, foundations, civil works, installation, electrical work, statutory approvals, accessibility compliance and professional sign-off remain with the appropriate project parties unless a specific support item is expressly included. Current governing-body rules, exact selected-system data and local requirements take precedence over this planning pack.