Define the project outcome
Record client type, site role, primary users, activity mix, approximate area and intended operating model.
System SelectorRIDEspan · SPECIFICATION & PLANNING CENTRE
RIDEspanActive Recreation SystemsA LUTHVAR sports brandThis workflow is designed for architects, landscape architects, councils, schools, developers and procurement teams who need to define the project before exact RIDEspan models are released.
Record client type, site role, primary users, activity mix, approximate area and intended operating model.
Use PUMP, FLOW, STREET, SKILLS or PARK as the starting system — not a supplier model number.
Allow for riding space, entry/exit, waiting, circulation, supervision, spectators and future expansion.
List every technical document that must be received before procurement: construction, surfaces, anchoring, loads, standards, maintenance, warranty and spares.
Define survey, civil works, base/slab, drainage, foundations, installation, electrical work, landscape and approvals.
Add shade, seating, hydration, bike parking, lighting, paths and amenities without creating rider conflicts.
Only after exact product evidence and project interfaces are accepted should the final module schedule be released.
Include drawings, manuals, inspection requirements, replacement parts, warranty, spares and responsibility matrix.
Minimum specification inputs
01Project / site description
02Selected RIDEspan pathway and purpose
03User groups and discipline assumptions
04Site plan and available envelope
05Activity / progression zoning
06Civil and base responsibility
07Exact product schedule
08Technical evidence register
09Installation scope
10Inspection and maintenance schedule
11Warranty and spares
12Freight / packing / delivery interface
Project handoff