Skip to main content
Apollo NZ GlobalStart Water Project Brief
RHELGAN Water Systems

RHELGAN · RAINWATER

Rainwater Harvesting Systems

Roof-catchment water systems combining debris control, first flush, storage, treatment and distribution for housing, schools, clinics and community facilities.

01ROOF CATCHMENT
02SCREENING
03FIRST FLUSH
04STORAGE
05TREATMENT
06DISTRIBUTION

Direct project answers

What project teams need to know about Rainwater Harvesting Systems.

A concise planning and evidence layer for early specification and project review.
01

What is RHELGAN Rainwater Harvesting Systems?

Roof-catchment water systems combining debris control, first flush, storage, treatment and distribution for housing, schools, clinics and community…

02

What projects are suitable for rainwater harvesting systems?

Typical project pathways include development infrastructure, remote communities, schools and health facilities, and international community water projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.

03

What information is needed to specify rainwater harvesting systems?

Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.

04

Can Apollo NZ Global supply rainwater harvesting systems internationally?

Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.

Where it fits

Applications that benefit from this pathway.

Remote housingSchools and campusesClinics and health facilitiesCommunity buildingsIsland developmentsSupplementary water supply

Selection factors

Define these before equipment is fixed.

01

Catchment area

02

Roof material

03

Rainfall pattern

04

Dry-season length

05

Daily demand

06

Intended water use

07

Overflow route

08

Top-up source

09

Tank footprint

Specification controls

Keep the public pathway useful without turning planning data into guarantees.

Storage is sized from catchment, rainfall and demand rather than tank preference.

Potable use requires appropriate source control, treatment and project water-quality management.

Overflow and stormwater interfaces are part of the design.

Cross-connection with other water supplies must be controlled.

Working resources

Carry this section through design, procurement and handover.

Project note

A larger tank does not automatically produce more usable water. Rainfall distribution, roof area, demand and acceptable shortage risk determine the useful storage volume.

Final equipment, material, capacity, certification, drawings, performance and commercial scope are confirmed against the exact project configuration.

RHELGAN · WATER STORAGE & SUPPLY SYSTEMS

Use the project brief to turn the requirement into a technical handoff.

Start Water Project Brief Upload project documents
Project