Skip to main content
Apollo NZ Global

RHELGAN · Water Project Brief

Start with the site, source and demand. Unknown details can stay unknown.

This brief is designed to establish the right technical questions before storage, treatment or pumping is fixed. A project does not need finished engineering to start, but country, intended use, water source and approximate users materially improve the first review.

01SOURCE
02ANALYSIS
03STORAGE
04TREATMENT
05PUMPING
06DISTRIBUTION

Direct project answers

What should be known before a RHELGAN water project brief is submitted?

Use these answers to understand what the brief does, what evidence matters and what information improves the first technical review.
01

What is RHELGAN Water Project Brief?

Structured water-project intake covering country, project type, users, water source, source-water analysis, intended use, daily demand, storage autonomy,…

02

What projects are suitable for water system project brief and RFQ?

Typical project pathways include development infrastructure, remote communities, schools and health facilities, and international community water projects. Final suitability depends on the exact configuration, site conditions, operating requirements and destination.

03

What information is needed to specify water system project brief and RFQ?

Before specification or quotation, the project review should confirm: Verified product specifications or documented product facts; Clear applications, limitations and configuration boundaries; Project inputs required for manual quotation or technical review; Apollo supply-only scope and purchaser/local-project responsibilities. Claims are kept tied to the exact proposed system rather than transferred from a related product or reference configuration.

04

Can Apollo NZ Global supply water system project brief and RFQ internationally?

Apollo can supply suitable projects internationally where the product and destination pathway are current. Send the project location, intended use, dimensions or quantities, timing, relevant drawings or photographs, and any known performance, compliance or environmental requirements for review.

Route 01 · Documents ready

I already have a water analysis, RFP, site plan or hydraulic brief.

Upload the documents first and keep later project information under the same Apollo reference.

Upload water documents

Route 02 · Early-stage water requirement

I know the project and source, but the final system has not been specified.

Use the structured brief below. RHELGAN can then define the next storage, treatment, pumping and documentation questions.

Open Water Brief

Useful starting information

Five inputs make the first technical review much stronger.

01

Destination + site

Country, site location, climate, exposure, topography, access and any known local water or public-health requirements.

02

Source

Rainwater, bore, surface, municipal, delivered, brackish, seawater or mixed source — plus reliability and available flow.

03

Demand + storage

People or users, intended water use, daily demand if known, desired autonomy and any existing or required storage volume.

04

Water quality

Upload a laboratory analysis where available. Treatment is selected from the actual source-water condition and required finished-water use.

05

Power + pumping

Grid, generator, solar or hybrid power; gravity or pumped distribution; elevations, pressure and solar-pumping interest.

Structured water intake

Turn the requirement into one controlled RHELGAN water brief.

01

Project + contact

Country, application and a contact point are enough to begin.

02

Demand + source water

Unknown is acceptable. Treatment is selected from the source-water condition and required finished-water quality.

03

Site + system architecture

These inputs define storage material, tank geometry, treatment, pumping and project interfaces.

04

Project description

Tell us the outcome, what is already known and what still needs to be resolved.

Submitting a brief creates no purchase commitment. Final storage, treatment, pumping and distribution are selected from actual demand, source-water quality, site conditions and destination requirements.

Scope control

The form starts the specification. It does not replace water, hydraulic, structural or public-health engineering.

Final demand, source-water quality, storage volume, treatment process, tank structure, foundations, pumps, electrical systems, pipework, installation, commissioning, operating responsibilities and destination requirements remain project-specific unless expressly included in the written Apollo scope.

Project