Skip to main content
Apollo NZ GlobalUpload project documents

Health · RHELGAN Standard Configuration

Small Community Clinic

Remote communities, development programmes, reconstruction projects and larger camps needing a more complete health post.

Planning referenceWide modular platform · 2 nominal 6.0 × 3.0 m modulesModule count2 joined modulesPlanning areaApprox. 36 m² gross combined footprint

Intended use

What this configuration is for.

Remote communities, development programmes, reconstruction projects and larger camps needing a more complete health post.

Starting room / fixture schedule

Base planning arrangement.

Waiting / receptionConsultation roomTreatment / procedure roomHandwashing pointsPatient / staff WC allowanceLockable store

Indicative supply pathway

What the supplied building package can include.

Joined structural modulesCleanable internal finish pathwayInternal partitionsDoors and windowsPlumbing / electrical / data rough-in pathwayVentilation / HVAC provision

Local / project scope

What remains project- and destination-specific.

FoundationExternal water / wastewater / powerMedical equipmentHealth-care waste handlingLocal clinical review / licensingCommissioning

Options

Change the standard only where the project needs it.

Accessible WCSecond consultation roomExternal covered waitingSolar / backup power interfaceMedicine storage / refrigerator zone

Before final specification

What still has to be confirmed for the project.

Exact external + internal clear dimensionsStructural joining / opening limitsDoor + window positions and sizesWet-area floor, drain and service interfacesElectrical / plumbing completion scopeFire, thermal, wind / seismic evidence as applicableCoastal / corrosion specification where requiredPacking, weights, lifting and receiving requirements

Configuration rules

Standard first. Project-specific where necessary.

This configuration is a public planning pathway rather than a complete technical specification. Final dimensions, structure, services, finishes and options are confirmed against the actual project.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use this configuration in a real project

Send the quantity, destination and project requirements.

The configuration provides a starting room and capacity pathway. RHELGAN then confirms technical requirements, local interfaces, documentation, freight and quotation basis for the project.

Programme Supply & Procurement Start RHELGAN project brief
Project