Health · RHELGAN Standard Configuration

First-Aid Module

Construction sites, field operations, camps, resorts and smaller community programmes requiring a dedicated first-aid space.

Planning referenceWide modular platform · nominal 6.0 × 3.0 m planning basisModule count1 modulePlanning areaApprox. 18 m² gross module footprint

Intended use

What this configuration is for.

Construction sites, field operations, camps, resorts and smaller community programmes requiring a dedicated first-aid space.

Starting room / fixture schedule

Base planning arrangement.

Reception / waiting pointConsultation / treatment areaHandwashing pointLockable medical storage allowance

Indicative supply pathway

What the supplied building package can include.

Structural moduleCleanable internal finish pathwayDoors and windowsHandwashing / plumbing rough-in pathwayElectrical / communications pathwayVentilation / HVAC provision

Local / project scope

What remains project- and destination-specific.

FoundationExternal servicesClinical equipmentMedical waste systemHealth licensing / local clinical requirementsFinal commissioning

Options

Change the standard only where the project needs it.

Dedicated WCSmall staff deskMedication refrigerator power pointExternal covered waitingAccessible entry package

Before final specification

What still has to be confirmed for the project.

Exact external + internal clear dimensionsStructural joining / opening limitsDoor + window positions and sizesWet-area floor, drain and service interfacesElectrical / plumbing completion scopeFire, thermal, wind / seismic evidence as applicableCoastal / corrosion specification where requiredPacking, weights, lifting and receiving requirements

Configuration rules

Standard first. Project-specific where necessary.

This configuration is a public planning pathway rather than a complete technical specification. Final dimensions, structure, services, finishes and options are confirmed against the actual project.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use this configuration in a real project

Send the quantity, destination and project requirements.

The configuration provides a starting room and capacity pathway. RHELGAN then confirms technical requirements, local interfaces, documentation, freight and quotation basis for the project.

Programme Supply & Procurement Start RHELGAN project brief