Skip to main content
Apollo NZ GlobalUpload project documents

Amenities · RHELGAN Standard Configuration

Accessible Amenity Module

Schools, parks, public facilities, sports grounds, camps and housing programmes requiring a repeatable accessible sanitary unit.

Planning referenceWide modular platform · nominal 6.0 × 3.0 m planning basisModule count1 modulePlanning areaApprox. 18 m² gross module footprint

Intended use

What this configuration is for.

Schools, parks, public facilities, sports grounds, camps and housing programmes requiring a repeatable accessible sanitary unit.

Starting room / fixture schedule

Base planning arrangement.

1 accessible WC1 accessible shower1 accessible basinTurning / transfer spaceCarer / service allowance where required

Indicative supply pathway

What the supplied building package can include.

Structural moduleAccessible wet-area planning basisWet-area floor and wall liningAccessible door / threshold pathwayInternal plumbing and electrical pathwayGrab-rail / fixture backing where specified

Local / project scope

What remains project- and destination-specific.

Accessible path to buildingFoundation and finished floor relationshipExternal servicesLocal accessibility review and sign-offFinal sanitary / building approvals

Options

Change the standard only where the project needs it.

WC-only versionWC + shower versionFamily / assisted-use configurationBaby-change optionEmergency call provision where specified

Before final specification

What still has to be confirmed for the project.

Exact external + internal clear dimensionsStructural joining / opening limitsDoor + window positions and sizesWet-area floor, drain and service interfacesElectrical / plumbing completion scopeFire, thermal, wind / seismic evidence as applicableCoastal / corrosion specification where requiredPacking, weights, lifting and receiving requirements

Configuration rules

Standard first. Project-specific where necessary.

This configuration is a public planning pathway rather than a complete technical specification. Final dimensions, structure, services, finishes and options are confirmed against the actual project.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use this configuration in a real project

Send the quantity, destination and project requirements.

The configuration provides a starting room and capacity pathway. RHELGAN then confirms technical requirements, local interfaces, documentation, freight and quotation basis for the project.

Programme Supply & Procurement Start RHELGAN project brief
Project