Planning referenceWide modular platform · nominal 6.0 × 3.0 m planning basisModule count1 modulePlanning areaApprox. 18 m² gross module footprint

Intended use

What this configuration is for.

Workforce camps, sports sites, schools, remote projects and community facilities where toilets and showers are needed together.

Starting room / fixture schedule

Base planning arrangement.

2 WC cubicles2 shower cubicles2 hand basinsService / hot-water interface zone

Indicative supply pathway

What the supplied building package can include.

Structural moduleWet-area floor and washable wall finishesInternal plumbing and fixture pathwayVentilation openings / extraction allowanceElectrical pathway for lighting and hot-water interfaceDoors, hardware and privacy partitions

Local / project scope

What remains project- and destination-specific.

Foundation / supportsExternal water and hot-water source unless includedExternal wastewater / treatment connectionSite drainageLocal plumbing / electrical completion and approvals

Options

Change the standard only where the project needs it.

Separate male / female versionsLocker / changing benchHot-water cylinder / system where project-specificExternal washdown tapCoastal / tropical finish upgrade

Before final specification

What still has to be confirmed for the project.

Exact external + internal clear dimensionsStructural joining / opening limitsDoor + window positions and sizesWet-area floor, drain and service interfacesElectrical / plumbing completion scopeFire, thermal, wind / seismic evidence as applicableCoastal / corrosion specification where requiredPacking, weights, lifting and receiving requirements

Configuration rules

Standard first. Project-specific where necessary.

This configuration is a public planning pathway rather than a complete technical specification. Final dimensions, structure, services, finishes and options are confirmed against the actual project.

Apollo is supply-only. Final structure, foundations, anchoring, fire, accessibility, services, installation, local engineering and statutory approvals remain project- and destination-specific.

Use this configuration in a real project

Send the quantity, destination and project requirements.

The configuration provides a starting room and capacity pathway. RHELGAN then confirms technical requirements, local interfaces, documentation, freight and quotation basis for the project.

Programme Supply & Procurement Start RHELGAN project brief
Project