KAVORA · PROJECT AUTHORITY CENTRE

Move from product interest to a controlled project specification.

Specify umbrellas, awnings, membrane shade and retractable roofs around shade geometry, wind management, drainage, fabric, movement, power, foundations and operating procedures.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

Shade area / footprint and sun orientation

02

Umbrella/awning/membrane/retractable-roof pathway

03

Wind exposure and required operating procedure

04

Rainwater and drainage objective

05

Fabric/membrane performance and colour

06

Foundation/fixing/substrate conditions

07

Motor/control/power requirement

08

Hospitality/event furniture clearances and service access

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Exact frame/material data

02

Fabric/membrane technical evidence

03

Wind evidence tied to exact configuration and operating state

04

Motor/control documentation

05

Foundation/fixing requirements

06

Fire performance where project requires it

07

Finish/corrosion, warranty and maintenance

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
Shade concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

Shade coverage and geometry

02

Frame/membrane/fabric system

03

Wind-management requirement

04

Rain/drainage strategy

05

Motor/control/power

06

Foundations/fixings

07

Finish/coastal exposure

08

Operating restrictions

09

Maintenance and storage/storm procedure

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Site plan/shade objective

02

System type

03

Dimensions

04

Wind/environment

05

Fabric/finish

06

Drainage

07

Power/controls

08

Foundation/fixing

09

Operating/storage requirements

10

Evidence/submittals

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Fabric/membrane cleaning

02

Frame/connection inspection

03

Motor/control service

04

Drainage cleaning

05

Foundation/fixing visual check

06

Wind/storm operating procedure

07

Seasonal storage where applicable

08

Spare motor/control/fabric components

AUTHORITY GUIDES

Go deeper on the decisions that usually control the project.

These guides sit below the owner page and above exact product selection, so search, specification and project planning all point to the same technical logic.

01

Architectural umbrella vs awning vs membrane shade.

Compare giant umbrellas, cassette/commercial awnings and membrane shade by footprint, wind management, fixing, rain behaviour, movement and hospitality use.

Read guide
02

Wind ratings for retractable shade: why operating state matters.

Understand wind ratings for umbrellas, awnings and retractable roofs by separating deployed, retracted and stowed operating states from site-specific structural design.

Read guide
03

Giant folding umbrella planning for resorts and hospitality.

Plan giant electric folding umbrellas around furniture layouts, clear heights, mast position, foundations, wind, controls, lighting and guest operations.

Read guide

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.