Skip to main content
Apollo NZ GlobalStart Project Brief

FÍSVOR · PROJECT AUTHORITY CENTRE

Move from product interest to a controlled project specification.

Match display brightness, viewing distance, direct-sun exposure, panel temperature, thermal design, enclosure, mounting, wind, network/content and service access to the actual installation.

01 · PROJECT INPUTS

Define the conditions before the exact system is released.

These inputs are deliberately upstream of model selection so the product does not dictate the brief.

01

Application: outdoor TV, commercial display or venue display

02

Screen size / viewing distance / orientation

03

Covered, partial-sun or full-sun exposure

04

Required brightness and ambient-light conditions

05

Panel-temperature / thermal-management requirement

06

Wall/freestanding/dual-sided/touch mounting pathway

07

Wind/structure and fixing substrate

08

Power, network, content/CMS and service access

02 · EVIDENCE CONTROL

Keep project claims attached to what the evidence actually proves.

Generic declarations, outdated catalogues or unrelated certificates should not be carried into a project as exact-system evidence.

01

Exact panel brightness and size data

02

Panel-temperature limits and thermal architecture for full-sun claims

03

IP/environmental evidence

04

Mounting/structure/fixing data

05

Touch/glass/display configuration evidence

06

Power/network/control documentation

07

Warranty, spares and service strategy

03 · CAD / DRAWING REGISTER

Planning references are not exact-system construction drawings.

Every drawing/model status stays visible so consultants know what can be used now and what only exists after configuration or project-specific design.

ResourceStatusPurpose
Display concept / planning layoutPublic planningEarly scope, interface and consultant coordination only.
Generic technical reference / typical detailPublic planningExplains system logic without representing an exact supplied configuration.
Exact-system GA / dimensional drawingExact-systemIssued only after the quoted system/configuration is known.
Native CAD / DWG / DXFVerify availabilityAvailability and revision must be confirmed against the exact supplied system.
BIM / Revit / IFC objectVerify availabilityOnly described as BIM where a genuine verified native model exists.
Foundation / fixing / setting-out drawingProject-specificDepends on site/building conditions, local engineering and the selected system.
Services / electrical / controls interfaceProject-specificCoordinates the supplied system with local power, data, water, drainage or controls.

04 · SPECIFICATION STARTER

Write the project around performance, interfaces and evidence.

These clauses are a project-planning structure, not a substitute for local professional specifications or exact-system documentation.

01

Application/environment class

02

Screen size and viewing distance

03

Brightness and thermal performance

04

Enclosure/IP/environment

05

Mounting/wind/structure

06

Touch/interactive configuration

07

Power/network/CMS

08

Service/replacement access

09

Evidence/warranty/spares

05 · TENDER / RFP SCHEDULE

Ask bidders for the same controlled information.

A consistent schedule makes technical comparison easier and reduces hidden assumptions.

01

Display schedule

02

Size/quantity

03

Viewing distance/orientation

04

Sun exposure

05

Mounting

06

Wind/environment

07

Power/network/CMS

08

Touch/interactive needs

09

Evidence

10

Service/warranty

06 · OPERATIONS & HANDOVER

Specify how the system will be maintained after delivery.

Maintenance, spares, records and inspection should be defined before purchase, especially for remote or high-use projects.

01

Screen/enclosure cleaning

02

Thermal/fan/filter monitoring

03

Brightness/content health check

04

Mount/fixing inspection

05

Seal/cable-gland inspection

06

Touch calibration where applicable

07

Network/CMS monitoring

08

Critical spare/display replacement plan

AUTHORITY GUIDES

Go deeper on the decisions that usually control the project.

These guides sit below the owner page and above exact product selection, so search, specification and project planning all point to the same technical logic.

01

Outdoor TV brightness: 2500 vs 3000 vs 3500+ nits.

Compare outdoor display brightness classes by covered, partial-sun and full-sun conditions, orientation, thermal design, viewing distance and service environment.

Read guide
02

Covered vs partial sun vs full sun outdoor displays.

Classify outdoor display applications by direct-sun exposure, orientation, thermal load, brightness, weather protection and mounting before exact product selection.

Read guide
03

Why brightness alone does not make a display full-sun suitable.

Understand the difference between display brightness and full-sun thermal suitability, including panel temperature, cooling, enclosure, glass, orientation and warranty.

Read guide

DOWNLOADABLE PROJECT RESOURCE

Carry the authority pack into the project file.

Export the current project-control structure, then replace planning statements with exact project/system information as the design develops.

Project