01Start with the architectural role
Architectural Metalwork Systems should be selected for the job it needs to perform on the building rather than from appearance alone. Typical pathways include Commercial buildings, Hotels and resorts, Public buildings, Stairs and circulation, Plant and service screening.
Record whether the system is primarily cladding, screening, solar control, ventilation, privacy, feature architecture or a combination. That role determines which geometry, support and evidence questions matter most.
02Define the geometry before the detail is frozen
Current design pathways can include Metal handrails and guardrails, Fabricated stairs and landings, Screens and grilles, Support frames and brackets, Architectural trims and edge pieces. The project drawings should define module logic, panel or profile direction, openings, corners, soffits, returns and visible joint intent before fabrication information is finalised.
Large or unusual modules should be reviewed against the actual material build-up, support centres, transport, lifting and installation sequence rather than inferred from an architectural render.
03Coordinate the support and fixing system
The visible façade element depends on the subframe, brackets, rails, anchors and supporting substrate behind it. Fixing visibility, tolerances, adjustment, thermal movement and replacement access should be considered with the front-facing design.
Structural loads and fixing capacity remain project-specific. Apollo coordinates the supplied system and available technical information; final structural design and local verification remain with the appointed project professionals unless expressly included.
04Tie evidence to the exact system build-up
Priority technical checks for this family include Material grade and section, Barrier / stair loads, Welding / fabrication QA, Anchors and substrate, Corrosion protection, Finish and tolerances. Any fire, structural, corrosion, bonding, coating or other performance evidence should match the actual material, thickness, assembly and finish being supplied.
Generic supplier certificates should not be transferred to a materially different façade build-up simply because the visible surface looks similar.
05Use samples, mock-ups and controlled drawings before production
Where colour, texture, pattern, joint alignment, curvature or close-range appearance matters, use project samples or mock-ups before the production finish is frozen.
The final release package should coordinate approved drawings, material and finish schedule, panel or profile references, subframe interfaces, fixing logic, delivery sequencing and any project-specific inspection requirements.